My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Authorize Funding for One (1) Additional Year for a Learning Management System
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025
>
Item 14 - Authorize Funding for One (1) Additional Year for a Learning Management System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 4:17:49 PM
Creation date
7/30/2025 4:16:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Human Resources
Item #
14
Date
8/5/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. . <br /> meridian <br /> MERIDIAN DeliverablesCLIENT Deliverables <br /> MERIDIAN Base HRIS template. Backfill and delivery of the three(3)flat files <br /> Configuration of the Meridian LMS HRIS to Meridian for processing: User Data, <br /> Tool based upon the completed Organizations,Job Titles. <br /> Requirements Document specified in task <br /> B.2 above. <br /> One pre-production load of a subset of <br /> CLIENT production ready data for CAT <br /> purposes. <br /> One production load of full user data into <br /> the CLIENT production environment. <br /> Assumptions <br /> One-way HRIS integration inbound to the HRIS Tool configured and tested per the <br /> Meridian LMS application only, Requirements specified in task B.2 above. <br /> Meridian configure the HRIS and load a in the Meridian LMS CLIENT Stage <br /> subset of CLIENT production ready user environment. <br /> data in the Meridian LMS CLIENT Stage One(1)final data load in Meridian LMS <br /> environment for testing purposes. CLIENT Production environment. <br /> MERIDIAN will conduct and support five(5) <br /> days of Customer Acceptance Testing for <br /> all tasks defined in section B herein. <br /> Upon completion of CAT, MERIDIAN will <br /> load a full set of CLIENT production data in <br /> the Meridian LMS CLIENT production <br /> environment. <br /> 5. Standard Setup Tasks; Production Installation <br /> The purpose of this task is to complete the installation of the Meridian LMS base application, <br /> database, configurations, branding and integrations into the Meridian LMS CLIENT production <br /> environment. <br /> MERIDIANDeliverables <br /> Meridian LMS CLIENT production base code Validation Meridian LMS CLIENT <br /> and database installation. Production install is completed per the <br /> MERIDIAN will apply applicable configurations, Requirements specified in task B.2 <br /> branding, and integrations. above. <br /> Assumptions Acceptance Criteria <br /> Limited to the installation of the application and Meridian LMS CLIENT Production <br /> database of one instance of the Meridian LMS application has been Installed and is <br /> CLIENT production environment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.