My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025 Regular
>
Agenda Packet_2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 5:11:00 PM
Creation date
7/30/2025 5:07:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. All pricing for additional scopes of work is va lid for ninety (90) calendar days from the date of <br />submission to the CLIENT. <br />3. Travel costs are not included in the Cost Estimate and will be invoiced per MERIDIAN'S curre nt <br />travel guidelines. <br />F. Out of Scope <br />The following is currently deemed outside of the scope for this implementation : <br />• Migrations. integrations , modifications to the system that are not explicitly included in the scope of <br />this SOW. <br />• Custom reports, localization. documentation, or online help. <br />• Content cleansing, migration, or uploading unless specifically identified. <br />• Consulting or professional serv ices not specified in the implementation tasks (i.e. coursewa re <br />development, courseware troubleshooting, SCORM, HW/SW configurations or internal network <br />setup or maintenance). <br />• Advanc ed Graphical design or other advanced (e.g. flash) GUI support. <br />• Editable training materials such as instructor and student guides. <br />G. Change Management <br />MERIDIAN recognizes that chang es are a normal part of the project life cycle. Changes to the <br />scope or timeline of the Services contemplated by this Agreement will require a formal Change <br />Order Statement of Work ("Schedul e 2 ") to be submitted by the MERID IAN Project Manager to the <br />CLIENT. Changes in scope may include an increase in cost and/or timeline and will be specified <br />in eac h change request. Prior to beginning the change request, CLIENT must execute the <br />Schedule 2 Change Order. MERIDIAN requires formal change acceptance before beginning work <br />on any changes. C hanges within the defined scope of the contract need approval by the CLIENT <br />Project Manager and the MERIDIAN Project Manager. Acceptance for scope cha nges , are given <br />when both the CLIENT Project Manager and the MERIDIAN Project Manager formally approve <br />the c hange by sign ing off on Schedule 2 so that miscommunications are avoided. Project change <br />procedure is as fo llows: <br />i. Identify change (can originate from the CLIENT Project Manager or the MERIDIAN Project <br />Manager); <br />i i. MERIDIAN completes Change Request Form ; <br />iii. MERIDIAN Project Manager determines the impact of the proposed change (schedule, <br />resources , time, and/or cost); <br />iv . MERIDIAN Project Manager submits Schedule 2 to the CLIENT Project Manager for <br />review/approval. <br />v. MERIDIAN Project Manager receives approval from the CLIENT Project Manager within <br />three (3) business days; and <br />vi . MERIDIAN Project Manager modifies or, if necessary , re-baselines the Project Schedule <br />and Plan to include the approved change. <br />' ' . . . -. . . . ' , . . . . <br />Saas Agreem,fnt: f!1ulti-Tenant • • . • meridianks.com · <br /> <br />City Council 14 – 41 8/5/2025
The URL can be used to link to this page
Your browser does not support the video tag.