My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025 Regular
>
Agenda Packet_2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 5:11:00 PM
Creation date
7/30/2025 5:07:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A Scope of Work – Graviton Consultant Agreement <br /> 15 <br /> <br />In the Plan stage of implementation an initial inventory of business process maps and use cases will be <br />established using out of the box Oracle Cloud application business processes. In the design stage, the <br />Graviton team will conduct Business Process Familiarization demonstrations of the Oracle Cloud <br />applications to expose City project team members to the capabilities of the Oracle Cloud applications. <br />In the design stage, Graviton will conduct Conference Room Pilot 1 work sessions, demonstrating <br />Oracle Cloud applications capabilities with City specific data and configuration. <br />In the Build stage the project team will conduct the Conference Room Pilot 2 and Conference Room <br />Pilot 3 work sessions, incorporating design decisions made through the iterative implementation <br />process and the configurations, reports, integrations, and conversions (CEMLIs) being completed by <br />the CEMLI team of project team resources. CEMLI stands for configuration, extension, modification, <br />localization, and integration. Graviton has also added the category Data Conversion. <br />The iterative process of conducting three Conference Room Pilots solidifies the design and build of the <br />Oracle Cloud applications. The project team will then move into the test stage where the City’s <br />business processes, reflected in the comprehensive inventory of use cases, become the basis for test <br />scenarios to be executed as acceptance criteria for both the system test and user acceptance test <br />formal test cycles. Upon completion of the test stage, the project team will move into the deploy <br />stage of the project knowing the organization’s business processes have been thoroughly analyzed, <br />designed, built, and tested through this comprehensive implementation process. <br /> <br />3.5.1 Business Process Maps <br />Business process maps provide a graphical depiction of the integrated business <br />processes. Business process maps will be introduced during the Plan stage and <br />will be continuously updated and added to over the course of implementation. <br />Business process maps will be incorporated by Graviton into job aids and training content to highlight <br />the business process changes to be implemented at the City. Business process maps also support <br /> <br /> <br />City Council 16 – 32 8/5/2025
The URL can be used to link to this page
Your browser does not support the video tag.