Laserfiche WebLink
COOPERATIVE COST REIMBURSEMENT AGREEMENT <br />MAIN STREET SLURRY SEAL AND RESURFACING PROJECT <br />COOPERATIVE COST REIMBURSEMENT AGREEMENT ("Agreement"), is made and entered <br />into this day of , 2025, by and between the CITY OF SANTA ANA, a <br />California charter city (“Santa Ana"), and the CITY OF ORANGE, a California municipal <br />corporation ("Orange"). In this Agreement, Santa Ana and Orange may each be individually <br />referred to as a "Party" and collectively referred to as the "Parties." <br />RECITALS: <br />WHEREAS, Santa Ana has initiated a street rehabilitation project (the "Project") to improve <br />the pavement condition of Main Street from Memory Lane to North City Limits. <br />WHEREAS, Main Street within the Project limits contain a portion of property within Santa <br />Ana and a portion of the street within the boundary of Orange; and <br />WHEREAS, In an effort to efficiently utilize Orange resources, Orange wishes to improve <br />the portion of Main Street within its boundary at the same time the Santa Ana Main Street Slurry <br />Seal and Resurfacing Project are conducted; and <br />WHEREAS, the Parties desire to repave Main Street, within their respective boundaries <br />as part of the "Project". <br />NOW, THEREFORE, based upon the foregoing Recitals, and for good and valuable <br />consideration, the receipt and sufficiency of which is acknowledged by all Parties, the Parties <br />agree as follows: <br />1. The City of Santa Ana will advertise for bids, hire a contractor, approve the work and administer <br />the contract for street rehabilitation. <br />2.Orange is responsible for: <br />(a)Orange shall pay Santa Ana for the actual cost of the work within the Orange portion <br />based upon unit prices bid of the Successful Contractor and quantities actually used <br />on the Orange portion as set forth in the Project Location Map (Exhibit A) and the City <br />Cost Sharing (Exhibit B), attached hereto and incorporated by this reference. Orange <br />will remit payment to Santa Ana within thirty (30) days of receipt of invoice evidencing <br />Project work performed within Orange city boundary. <br />(b) Orange shall pay Santa Ana for the actual cost of design engineering and construction <br />engineering services provided for the work within the Orange portion based upon the <br />time spent by Santa Ana staff. Orange will remit payment to Santa Ana within thirty <br />(30)days of receipt of invoice evidencing Project work performed within Orange city <br />boundary. <br />3.Orange will coordinate the relocation of all affected utility company facilities within the City limits <br />of Orange in a timely manner. <br />EXHIBIT 2 <br />  <br />  <br />City Council 17 – 8 8/5/2025