My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025 Regular
>
Agenda Packet_2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 5:11:00 PM
Creation date
7/30/2025 5:07:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Application of slurry seal, crack seal, and minor pavement <br />resurfacing with asphalt concrete. The work also include <br />replacement/installation of missing or damaged curbs, gutters, <br />sidewalk, driveway approaches, wheelchair ramps, and striping. <br />PROJECT NEED: <br />The City's Pavement Management Program has been developed to <br />identify the preventative maintenance requirements for the City's street <br />network. The application of a surface seal to streets with improvements <br />constructed in the last 10 years will ensure a high level of service for <br />years to come. <br />PROJECT TITLE: <br />Main St Slurry Seal & Resurf: <br />Memory - N City Limit <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works Design Engineering Gilbert Castillo, Senior Engineer 24-Jul-2025 <br />PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />Construction 676,046 ------ <br />Engineering 30,000 ------ <br />Other 141,954 ------ <br />TOTAL 848,000 ------ <br />SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />M2 LOCAL FAIRSHARE 848,000 ------ <br />TOTAL 848,000 ------ <br />EXHIBIT 6 <br /> <br /> <br />City Council 17 – 30 8/5/2025
The URL can be used to link to this page
Your browser does not support the video tag.