Laserfiche WebLink
CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Application of slurry seal, crack seal, and minor pavement <br />resurfacing with asphalt concrete. The work also include <br />replacement/installation of missing or damaged curbs, gutters, <br />sidewalk, driveway approaches, wheelchair ramps, and striping. <br />PROJECT NEED: <br />The City's Pavement Management Program has been developed to <br />identify the preventative maintenance requirements for the City's street <br />network. The application of a surface seal to streets with improvements <br />constructed in the last 10 years will ensure a high level of service for <br />years to come. <br />PROJECT TITLE: <br />Main St Slurry Seal & Resurf: <br />Memory - N City Limit <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works Design Engineering Gilbert Castillo, Senior Engineer 24-Jul-2025 <br />PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />Construction 676,046 ------ <br />Engineering 30,000 ------ <br />Other 141,954 ------ <br />TOTAL 848,000 ------ <br />SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />M2 LOCAL FAIRSHARE 848,000 ------ <br />TOTAL 848,000 ------ <br />EXHIBIT 6 <br />  <br />  <br />City Council 17 – 30 8/5/2025