My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025 Regular
>
Agenda Packet_2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 5:11:00 PM
Creation date
7/30/2025 5:07:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has been <br />developed to prioritize and recommend the most cost-effective roadway <br />repairs, and maximize the return from available funding for street <br />pavement. This segment of Bedford Road pavement rehabilitation is <br />identified as a high priority in the PMP. <br />PROJECT TITLE: <br />Bedford Rd Rehab: Main Pl - N City <br />Limit <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works Design Engineering Gilbert Castillo, Senior Engineer 24-Jul-2025 <br />PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />Construction 314,670 ------ <br />Engineering 3,000 ------ <br />TOTAL 317,670 ------ <br />SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />104,670 ------ <br />40,000 ------ <br />SELECT STREET CONSTRUCTION <br />M2 LOCAL FAIRSHARE <br />RMRA SB1 173,000 ------ <br />TOTAL 317,670 ------ <br /> <br /> <br />City Council 17 – 31 8/5/2025
The URL can be used to link to this page
Your browser does not support the video tag.