My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Main Street Rehabilitation from Memory Lane to North City Limits and Bedford Road Rehabilitation at Mainplace Drive
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025
>
Item 17 - Main Street Rehabilitation from Memory Lane to North City Limits and Bedford Road Rehabilitation at Mainplace Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 5:08:25 PM
Creation date
7/30/2025 5:08:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
8/5/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Main Street Rehabilitation from Memory Lane to North City Limits and Bedford Road <br /> Rehabilitation at Mainplace Drive <br /> August 5, 2025 <br /> Page 3 <br /> bids. A total of four bids were received. No bids were received from Santa Ana <br /> contractors. <br /> As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br /> newspaper on June 10 and June 17, 2025. The project was also advertised in <br /> PlanetBids from June 10, 2025 to June 26, 2025. Bids were received electronically via <br /> PlanetBids on June 26, 2025. No bid protest was submitted by any of the bidders during <br /> the bid protest period. <br /> A copy of construction plans, contracts, specifications, and all related reference <br /> materials (such as The Greenbook) are available for public review at the City's Public <br /> Works Agency, Central Files office located in City Hall. <br /> Bid Results Summary <br /> RANK BIDDER'S NAME LOCATION BASE BID <br /> 1 All American Asphalt Corona, CA $792,573 <br /> 2 Hardy & Harper, Inc. Lake Forest, CA $821,480 <br /> 3 R.J. Noble Company Orange, CA $908,180 <br /> 4 Excel Paving Co. Long Beach, CA $968,852 <br /> A total of four bids were received and four were deemed responsive. All American <br /> Asphalt submitted the lowest responsive base bid in the amount of $792,573 (Exhibit 3). <br /> As specified in the bid documents, the lowest bid shall be determined on the basis of <br /> the Base Bid. Based on the bid analysis and a contractor's reference check, staff <br /> recommends awarding the construction contract to $792,573 (Exhibit 4). <br /> All American Asphalt has previously performed work as a prime contractor in the City of <br /> Santa Ana within the past five years, including Local Street Preventative Maintenance <br /> FY23-24 and Grand Rehabilitation from Warner to Edinger. The contractor satisfactorily <br /> completed these projects and staff recommends awarding the construction contract to <br /> All American Asphalt for the construction of the Project. (Exhibit 4). <br /> Project Delivery <br /> To deliver a complete project, in addition to the construction contract, the estimated total <br /> project delivery cost includes a budget allocation for construction administration, <br /> inspection, and testing. Construction administration and inspection may be performed <br /> by either Staff or consultants and includes construction management, inspection of the <br /> Contractor's work to ensure contract compliance, workmanship and quality, materials <br /> testing, and implementation of the labor requirements. <br /> Any of the allocated construction administration funds not spent are considered project <br /> savings and are returned to the respective fund balance upon close out of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.