Scope of Work <br />• Node 3 (Bristol and Santa Ana). <br />• Siemens has been asked to provide redundant coverage for Bristol/Santa Ana. The intersection cameras will <br />have 5 points of view under one Camera Housing. <br />• In addition to this, all communication from each point will have wireless communication, pointing back <br />over to Santa Ana Police Department, where there is existing network at the Police Department. <br />• The intersection will have (1) Multi-Imager, (1) PTZ, (1) Nema Rated Enclosure, (1) Network Switch, (2) <br />Power <br />Injectors, and (2) Antennas (wireless communication) per pole. <br />• **It is expected that the City provide power at each pole for each of the two intersection cameras. <br />• Siemens will test, commission, and program to ensure complete operability. <br />TOTAL FOR ABOVE:$23,846.38 <br />Engineering Scope of Work Add: <br />Our team will research and obtain the as-builts for the traffic signals for the project locations. The field <br />review will include work necessary to inspect the project site with respect to needs for preparing engineering <br />plans. This includes verifying the conduit runs from the existing service meter to location to the proposed <br />equipment location. <br />All information obtained from records will be verified in the field in conjunction with this review. <br />Based on the field review, we will provide design plans for each intersection <br />depicting all the proposed improvements. <br />The plans will be prepared with detailed design for the modifications of three traffic signals. It is anticipated <br />that the plans will include the following: <br />•Construction notes for equipment (CCTV cameras, radios, switches, etc.) to be installed in the traffic <br />signal poles or cabinets. <br />•Conductor schedule will only identify proposed conductors to be installed. <br />The design plans will be submitted for City review up to two (2) times at 90% and 100% progress level. The <br />final plans will be submitted as signed and sealed by Professional Engineer approved for construction. The <br />plans will conform to the requirements of the City of Santa Ana. <br />TOTAL FOR ENGINEERING ADD: $18,427.05 <br />Page 3 of 8