My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Fourth Amendment to Agreement Regarding City-Wide Security System Maintenance
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/19/2025
>
Item 12 - Fourth Amendment to Agreement Regarding City-Wide Security System Maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 9:31:29 AM
Creation date
8/13/2025 8:19:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
12
Date
8/19/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br />• Node 3 (Bristol and Santa Ana). <br />• Siemens has been asked to provide redundant coverage for Bristol/Santa Ana. The intersection cameras will <br />have 5 points of view under one Camera Housing. <br />• In addition to this, all communication from each point will have wireless communication, pointing back <br />over to Santa Ana Police Department, where there is existing network at the Police Department. <br />• The intersection will have (1) Multi-Imager, (1) PTZ, (1) Nema Rated Enclosure, (1) Network Switch, (2) <br />Power <br />Injectors, and (2) Antennas (wireless communication) per pole. <br />• **It is expected that the City provide power at each pole for each of the two intersection cameras. <br />• Siemens will test, commission, and program to ensure complete operability. <br />TOTAL FOR ABOVE:$23,846.38 <br />Engineering Scope of Work Add: <br />Our team will research and obtain the as-builts for the traffic signals for the project locations. The field <br />review will include work necessary to inspect the project site with respect to needs for preparing engineering <br />plans. This includes verifying the conduit runs from the existing service meter to location to the proposed <br />equipment location. <br />All information obtained from records will be verified in the field in conjunction with this review. <br />Based on the field review, we will provide design plans for each intersection <br />depicting all the proposed improvements. <br />The plans will be prepared with detailed design for the modifications of three traffic signals. It is anticipated <br />that the plans will include the following: <br />•Construction notes for equipment (CCTV cameras, radios, switches, etc.) to be installed in the traffic <br />signal poles or cabinets. <br />•Conductor schedule will only identify proposed conductors to be installed. <br />The design plans will be submitted for City review up to two (2) times at 90% and 100% progress level. The <br />final plans will be submitted as signed and sealed by Professional Engineer approved for construction. The <br />plans will conform to the requirements of the City of Santa Ana. <br />TOTAL FOR ENGINEERING ADD: $18,427.05 <br />Page 3 of 8
The URL can be used to link to this page
Your browser does not support the video tag.