My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso25-23_1030 E. Fourth St.
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2025
>
Reso25-23_1030 E. Fourth St.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 10:32:53 AM
Creation date
8/28/2025 10:32:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2025-23 <br />Page 8 of 12 <br />EXHIBIT A <br />Conditions of Approval for Conditional Use Permit No. 2025-12 <br />Conditional Use Permit No. 2025-12 to allow the expansion of an existing, legally <br />established self-storage facility, including modifications to the required yard standards is <br />approved subject to compliance, to the reasonable satisfaction of the Planning Manager, <br />with all applicable sections of the Santa Ana Municipal Code (SAMC), the California <br />Administrative Code, the California Building Standards Code, and all other applicable <br />regulations. <br />The Applicant must comply with each and every condition listed below prior to exercising <br />the rights conferred by this Conditional Use Permit. <br />The Applicant shall remain in compliance with all conditions listed below throughout the life <br />of the Conditional Use Permit. Failure to comply with each and every condition may result <br />in the revocation of this Conditional Use Permit. <br />1.All proposed site improvements must conform to Development Project Review (DP) <br />No. 2024-08, and the staff report exhibits incorporated herein by reference. <br />2.Prior to issuance of a building permit, the Applicant shall satisfy all site improvement <br />requirements identified by the City’s Development Review Committee (DRC) as part <br />of DP No. 2024-08. <br />3.Any proposed amendment to this Conditional Use Permit, including modifications to <br />approved materials, finishes, architecture, site plan, landscaping, parking, and <br />square footages, must be submitted to the Planning Division for review. At that time, <br />staff will determine if administrative relief is available or if the site plan review must <br />be amended. <br />4.Exterior building materials, finishes and colors for the Project shall comply with the <br />approved materials board submitted for the Project and as approved by the Planning <br />and Building Agency. Any changes to the materials, finishes and colors shall be <br />approved by the Planning and Building Agency. All new trash enclosures and similar <br />ancillary structures shall match the texture, material and color of the primary building. <br />5.During all phases of construction, the Applicant shall implement best management <br />practices (BMPs) to minimize noise, dust, and traffic disruption. Construction hours <br />shall comply with SAMC regulations. Construction staging areas shall be located to <br />minimize impacts on adjacent residential uses. <br />6.The Applicant shall maintain a minimum of 11 parking spaces on site, per the <br />submitted site plan for the Conditional Use Permit and DP. <br />7.The Planning Division shall review this Conditional Use Permit no later than twelve
The URL can be used to link to this page
Your browser does not support the video tag.