Laserfiche WebLink
Resolution No. 2025-23 <br />Page 9 of 12 <br />(12) months after full execution. Should any issues arise during such review, the <br />Conditional Use Permit shall be scheduled for public hearing at the Applicant’s full <br />expense for potential condition modification(s). <br />8.Violations of this Conditional Use Permit, as contained in Section 41 -647.5 of the <br />SAMC, will be grounds for permit revocation and/or suspension as described in <br />Section 41-651 of the SAMC. <br />9.The Applicant shall designate an on-site operations manager to oversee daily <br />activities, respond to community concerns, and ensure compliance with City <br />regulations and conditions of approval. <br />10.A 24-hour contact number shall be provided to the City for reporting of any noise, <br />safety, or operational issues. <br />11.Security cameras shall be installed to monitor entrances, drive aisles, and building <br />perimeters, and shall be maintained in working order. Camera footage shall be <br />retained for a minimum of 30 days and made available to the City of Santa Ana <br />Police Department upon request. <br />12.Any wall pack lighting and light standards shall be architecturally compatible with the <br />proposed architecture, as determined by City staff. <br />13.The Applicant shall improve lighting throughout the entire site, beyond the immediate <br />vicinity of the new building, to ensure adequate security. All outdoor lighting shall be <br />fully shielded, directed downward, and comply with the City’s lighting standards to <br />prevent light spillover onto adjacent properties, including residential to the west. <br />Dimmer switches shall be provided for all light standards and wall pack lighting on <br />the west elevation. <br />14.A photometric lighting plan shall be submitted for review and a pproval by the <br />Planning and Building Agency (PBA) as well as the Police Department prior to the <br />issuance of building permits. <br />15.Noise levels shall not exceed thresholds set by the SAMC at property lines. If <br />requested by the City, a noise study shall be conducted at Applicant’s expense in <br />order to verify compliance with SAMC thresholds. <br />16.All exterior signage shall comply with Chapter 41 of the SAMC and shall be reviewed <br />under a separate sign permit. No electronic message boards or backlit cabinet signs <br />are permitted unless otherwise approved. <br />17.All existing and new mechanical equipment shall be screened from view from public <br />and courtyard areas. <br />18.The roof mounted mechanical equipment on the new building (i.e., air <br />conditioning/condenser unit and ventilation ducts) shall be located away from public