My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet 4.28.25
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2025
>
Packet 4.28.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:47:35 AM
Creation date
9/2/2025 9:43:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CEQA Class 32 Exemption – 400 W Warner Ave <br />April 7, 2025 <br />Page 2 of 10 <br /> <br /> <br />would implement all necessary on-site utility and storm water management infrastructure that would connect to <br />the existing infrastructure systems on West Warner Avenue and South Birch Street, consistent with City <br />requirements. <br /> <br />Construction of the Project is expected to commence in September 2025 and would last through February 2026. <br />The following construction activities would occur as part of the Project: <br /> <br />• Demolition <br />• Site Preparation <br />• Grading <br />• Building Construction <br />• Paving <br />• Architectural Coating <br /> <br />Miscellaneous site demolition for the Project will include (i) landscape, (ii) a small building, and (iii) miscellaneous <br />parking lot lights. The existing building and parking lot will remain intact, and the existing building is being <br />delivered as a cold shell. As a conservative estimate, this analysis assumes to up to 100 tons of debris will be <br />generated from demolition activities. No import or export of soils would be required. <br /> <br />The information presented in this Memorandum is based on our review and analysis of the following documents <br />and information: (a) materials provided by the Project Applicant regarding the proposed Project; (b) publicly <br />available documents and information from the City of Santa Ana website, including but not limited to the City’s <br />General Plan, Zoning and Land Use Code, and (c) information provided by the City of Santa Ana staff. <br /> <br />II. EXISTING CONDITIONS <br />A. Existing Land Use <br />The Project site is currently developed with an approximate 57,705 sf one-story concrete building and an <br />approximate 1,115 sf one-story metal secondary building for a total building perimeter footprint area of 58,820sf <br />on a 4.99-acre property located at 400 West Warner Avenue in the City of Santa Ana. The Project site was <br />developed sometime between 1952 and 1963 and was previously occupied by the former Sears Parts & Repair <br />Center. <br /> <br />B. Existing General Plan Designation <br />The City of Santa Ana General Plan designates the Project site as Industrial (IND). The Industrial (IND) land use <br />designation provides space for activities such as light and heavy manufacturing, warehousing, processing, and <br />distribution as well as commercial uses ancillary to industrial activities. Industrial districts are significant sources <br />of employment and municipal revenue, and they contribute to the economic health of the City and the region. <br />The maximum floor area ratio (FAR) for the allowed use is 0.45 and the typical maximum height is 35 feet. <br /> <br />C. Existing Zoning <br />The Project site is located within the Light Industrial (M-1) district. Chapter 41 Division 18 Section 41-472 through <br />472.5 of the City’s Municipal Code provides a list of uses permitted or conditionally permitted in the M-1 district. <br />
The URL can be used to link to this page
Your browser does not support the video tag.