My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet 4.28.25
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2025
>
Packet 4.28.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:47:35 AM
Creation date
9/2/2025 9:43:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Resolution No. 2025-XX <br />Page 10 of 14 <br />6. The hours of operation for the indoor sports facility shall be between 7:00 a.m. and <br />10:00 p.m. daily, pursuant to Section 41-482 of the SAMC. <br /> <br />7. The use of amplified music or other sound-emitting equipment shall be prohibited <br />after 9:00 p.m. on weekdays and 10:00 p.m. on weekends. <br /> <br />8. The Applicant shall maintain a minimum of 116 parking spaces on site, per the <br />submitted site plan for CUP and DP. <br /> <br />9. The Planning Division shall review this Conditional Use Permit no later than twelve <br />(12) months after full execution. Should any issues arise during such review, the <br />Conditional Use Permit shall be scheduled for public hearing at the Applicant’s full <br />expense for potential condition modification(s). <br /> <br />10. Violations of this Conditional Use Permit, as contained in Section 41-647.5 of the <br />SAMC, will be grounds for permit revocation and/or suspension as described in <br />Section 41-651 of the SAMC. <br /> <br />11. The Applicant shall designate an on-site operations manager to oversee daily <br />activities, respond to community concerns, and ensure compliance with City <br />regulations and conditions of approval. <br /> <br />12. A 24-hour contact number shall be provided to the City for reporting of any noise, <br />safety, or operational issues. <br /> <br />13. All outdoor lighting, including stadium-style fixtures, shall be fully shielded, directed <br />downward, and comply with the City’s lighting standards to prevent light spillover <br />onto adjacent properties, including Warner Avenue and the residential and school <br />uses to the north. <br /> <br />14. A photometric lighting plan shall be submitted for review and approval by the <br />Planning and Building Agency (PBA) as well as the Police Department prior to the <br />issuance of building permits. <br /> <br />15. Noise levels shall not exceed thresholds set by the SAMC at property lines. If <br />requested by the City, a noise study shall be conducted at Applicant’s expense in <br />order to verify compliance with SAMC thresholds. <br /> <br />16. All existing and new mechanical equipment shall be screened from view from public <br />and courtyard areas. <br /> <br />17. The existing roof mounted mechanical equipment (i.e., air conditioning/condenser <br />unit and ventilation ducts) located on the northeast corner of the existing building <br />shall be removed and relocated away from public and courtyard areas. The roof shall <br />also be replaced/repaired in-kind after removal of the mechanical equipment. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.