Laserfiche WebLink
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Indus￿al S￿et Repair P￿g￿m This p￿ject entails the ￿hab￿ita￿on of exist￿g ￿adway pavement <br />for industrial s￿ets. ￿e p￿ect ￿￿￿ ￿clude the ￿moval and <br />replacement of exis￿ng asphalt streets￿ ￿￿ous ￿placement <br />pavement strategies ￿￿ be investigated to dete￿ine the most cost <br />effective and maintainable treatment. M￿or conc￿te repair to <br />seve￿ly damaged or missing curbs, gutte￿, sidewalks, and <br />￿eelchair ramps ￿￿￿ also be included. <br />￿e ￿te￿or ￿adway of non-￿siden￿al street has been identified as <br />prio￿ty by the Ci￿'s Pavement Management ￿tem￿ The pavement is <br />dete￿o￿￿ng due to weather, age, and hea￿ usage.PROJECT CATEGORY: <br />Street Imp￿vements <br />Local S￿et Resu￿￿cing <br />LOCATION MAP <br />PROJECT COSTS <br />Construction <br />FY 25/26 <br />2,710,000 <br />147,801 <br />FY 26/27 FY 27/28 FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />Engineering <br />TOTAL 2,857,801 <br />SOURCE OF FUNDS <br />GENERAL FUND <br />FY 25/26 <br />250,000 <br />FY 26/27 FY 27/28 <br />OTHER 2,607,801 <br />REFUSE MAINTENANCE <br />TOTAL 2,857,801 <br />AGENCY: <br />Public ￿￿ <br />DIVISION: <br />GIP Enginee￿ng <br />CONTACT: <br />Jason ￿ab￿e￿, ￿￿c￿pa￿ Civ￿ ￿gineer <br />DATE: <br />17-Apr-2025 <br />10