|
<br />CITY OF SANTA ANA FY 25/26CIP
<br />CAPITAL IMPROVEMENT PROJECT
<br />WORKSHEET
<br />PROJECT TITLE:
<br />Local Set Pventative
<br />Maintenance
<br />PROJECT DESCRIPTION:
<br />This pject pdes r the appcation of crack seal and slu seal
<br />to vaous stets citywide ith minor coldm and moval and
<br />replacement of asphalt concrete pavement.
<br />PROJECT NEED:
<br />e Cit's Pavement Management gram has been developed to
<br />idenf the preventative maintenance quiments r the Cis stet
<br />netork. The appcaon of a suce seal to sets i impvements
<br />constcted in the last 10 ea ensure a high level of sece r
<br />ea to come.PROJECT CATEGORY:
<br />Street Impveents
<br />Local Set Resucing
<br />LOCATION MAP
<br />PROJECT COSTS
<br />Construction
<br />FY 25/26
<br />4,058,548
<br />400,000
<br />FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32
<br />4,000,000 4,000,000 4,000,000 4,000,000 4,000,000 4,000,000
<br />Engineering
<br />TOTAL 4,458,548 4,000,000 4,000,000 4,000,000
<br />FY 28/29
<br />4,000,000
<br />FY 29/30
<br />4,000,000
<br />FY 30/31
<br />4,000,000
<br />FY 31/32
<br />CITIDE
<br />SOURCE OF FUNDS
<br />GENERAL FUND
<br />FY 25/26
<br />975,000
<br />FY 26/27 FY 27/28
<br />M2 LOCAL FAIRSHARE 3,483,548
<br />4,458,548
<br />4,000,000 4,000,000 4,000,000 4,000,000 4,000,000 4,000,000
<br />TOTAL 4,000,000 4,000,000 4,000,000 4,000,000 4,000,000 4,000,000
<br />AGENCY:DIVISION:CONTACT:DATE:
<br />Public GIP Engineeng Alex Bangean, Senior Civ Engineer 17-Apr-2025
<br />11
|