Laserfiche WebLink
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Euc￿d St Rehab: McFadden to 1st Reconstructio￿￿￿su￿acing of existing p￿vement ￿nd <br />repl￿cemen￿￿nst￿￿￿t￿on of missing or d￿m￿ged, cu￿s, gutte￿, <br />sidew￿lks, ￿￿vew￿y ￿pp￿￿ches￿ ￿nd wheelch￿￿ ￿mps wi￿in ￿is <br />segment of ￿￿dw￿y. <br />￿e City's P￿vement M￿n￿gement ￿￿gr￿m ￿MP) h￿s been <br />developed to p￿o￿t￿ze ￿nd recommend the most cost-e￿￿c￿ve <br />￿￿dw￿y <br />rep￿￿￿ ￿nd m￿￿im￿e the ￿tu￿ ￿m ￿v￿￿￿ble ￿nding for street <br />p￿vement. This segment of Euclid Street p￿vement reh￿b￿it￿tion is <br />identified as a high p￿ori￿ in the PMP. <br />PROJECT CATEGORY: <br />Street Imp￿ve￿ents <br />A￿erial S￿et Rehab￿ta￿on <br />￿ <br />LOCATION MAP ￿ <br />PROJECT COSTS <br />Construction <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />4,806,000 <br />Engineering <br />TOTAL 4,806,000 <br />··-SOURCE OF FUNDS <br />GAS TAX <br />FY 25/26 FY 26/27 FY 27/28 <br />4,806,000 <br />RMRA SB1 <br />TOTAL 4,806,000 <br />￿ <br />I <br />AGENCY: <br />Public ￿￿ <br />DIVISION: <br />GIP Enginee￿ng <br />CONTACT: <br />￿￿￿e￿ Cast￿￿o, Senior Engineer <br />DATE: <br />17-Apr-2025 <br />20