Laserfiche WebLink
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Grand Ave Rehab: 1st to Santa Ana Reconstructio￿￿￿su￿acing ofexisting p￿vement ￿nd ￿is segment of￿￿dw￿y h￿s been ident￿fied as a high p￿o￿ty by the <br />City's P￿vement M￿n￿gement System. ￿e p￿vement is dete￿or￿ting <br />due to ￿e we￿ther, ￿ge, ￿nd he￿vy us￿ge. Some of the ￿dj￿cent <br />cu￿s￿ gu￿ers, d￿ve￿y ￿pp￿￿ches, curb r￿mps, ￿nd sidew￿lks ￿re <br />￿lso in v￿￿ous st￿tes of ￿srep￿ir ￿nd ￿qui￿ repl￿cement. <br />repl￿cemen￿￿nst￿￿￿t￿on ofmissing or d￿m￿ged, cu￿s, <br />gutte￿, <br />sidew￿lks, ￿￿vew￿y ￿pp￿￿ches, ￿nd wheelch￿￿ ￿mps ￿long <br />G￿nd Avenue between 1st Street ￿nd S￿nt￿ An￿ Boulev￿rd. <br />PROJECT CATEGORY: <br />Street Imp￿ve￿ents <br />A￿erial S￿et Rehab￿ta￿on <br />LOCATION MAP <br />..￿ <br />,,,￿" <br />￿ <br />" <br />PROJECT COSTS <br />Construction <br />Engineering <br />FY 25/26 <br />2,675,000 <br />297,300 <br />FY 26/27 FY 27/28 FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />•2,972,300TOTAL\'•￿￿ <br />\SOURCE OF FUNDS <br />GAS TAX <br />FY 25/26 <br />2,675,000 <br />297,300 <br />FY 26/27 FY 27/28 <br />RMRA SB1 <br />TOTAL 2,972,300 <br />AGENCY: <br />Public ￿￿ <br />DIVISION: <br />GIP Enginee￿ng <br />CONTACT: <br />Alex Bangean, Senior Civ￿ Engineer <br />DATE: <br />17-Apr-2025 <br />21