Laserfiche WebLink
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />PROJECT TITLE: <br />Main St Rehab: Edgewood to <br />Memo￿ Lane <br />PROJECT DESCRIPTION:PROJECT NEED: <br />Reconstructio￿￿￿su￿acing ofexisting p￿vement ￿nd <br />repl￿cemen￿￿nst￿￿￿t￿on ofmissing or d￿m￿ged, cu￿s, gutte￿, <br />sidew￿lks, ￿￿vew￿y ￿pp￿￿ches, ￿nd wheelch￿￿ ￿mps wi￿in ￿long <br />M￿in between Edgewood ￿nd Memo￿ L￿ne. <br />￿is segment of￿￿dw￿y h￿s been ident￿fied as a high p￿o￿ty by the <br />City's P￿vement M￿n￿gement System. ￿e p￿vement is dete￿or￿ting <br />due to ￿e we￿ther, ￿ge, ￿nd he￿vy us￿ge. Some of the ￿dj￿cent <br />cu￿s￿ gu￿ers, d￿ve￿y ￿pp￿￿ches, curb r￿mps, ￿nd sidew￿lks ￿re <br />￿lso in v￿￿ous st￿tes of ￿srep￿ir ￿nd ￿qui￿ repl￿cement.PROJECT CATEGORY: <br />Street Imp￿ve￿ents <br />A￿erial Street Rehab￿ta￿on <br />LOCATION MAP <br />PROJECT COSTS <br />Engineering <br />FY 25/26 <br />274,200 <br />274,200 <br />FY 26/27 <br />FY 26/27 <br />FY 27/28 <br />FY 27/28 <br />FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />￿￿￿ <br />￿ <br />TOTAL <br />SOURCE OF FUNDS <br />RMRASB1 <br />FY 25/26 <br />274,200 <br />274,200TOTAL <br />AGENCY: <br />Public ￿￿ <br />DIVISION: <br />GIP Enginee￿ng <br />CONTACT: <br />Jason ￿ab￿e￿, ￿￿c￿pa￿ Civ￿ ￿gineer <br />DATE: <br />17-Apr-2025 <br />23