Laserfiche WebLink
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />￿----------------￿ <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Memo￿ Ln and Ma￿place Dr Multi- <br />Modal S￿et Imp￿v￿ments <br />P￿ect wi￿ cons￿￿ct a class I b￿eway on Ma￿￿ace D￿ve IMemo￿ <br />Lane f￿m Broadway to Ci￿ Place D￿ve. Wo￿ ￿￿￿ include ￿mo￿g <br />one vehicular lane in o￿er to const￿ct the Class I bikewa￿ <br />Additional wo￿ includes side￿lk widening, curb and gutter, street <br />wo￿ and traffic signal mo￿￿￿ca￿ons￿ <br />Discove￿ Cube expansion ￿￿ necessitate the ￿moval o￿ the adjacent <br />existing class I bikeway along San￿ago Creek. In tum an equal class I <br />bikeway ￿placement ￿c￿￿t￿ is ￿qu￿d by the State o￿ Ca￿￿o￿ia￿ <br />￿is <br />p￿ect ￿￿ meet this requ￿men￿￿PROJECT CATEGORY: <br />Street Imp￿ve￿ents <br />A￿erial Street Rehab￿ta￿on <br />LOCATION MAP <br />----PROJECT COSTS <br />Engineering <br />FY 25/26 <br />560,000 <br />130,000 <br />690,000 <br />FY 26/27 FY 27/28 FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />----Planning <br />TOTAL <br />' <br />￿l ￿-￿￿￿￿￿----SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 <br />TRANSPSYSTEMIMPR <br />V <br />690,000 <br />AREA <br />TOTAL 690,000 <br />AGENCY: <br />Public ￿￿ <br />DIVISION: <br />GIP Enginee￿ng <br />CONTACT: <br />Jason ￿ab￿e￿, ￿￿c￿pa￿ Civ￿ ￿ginee￿ <br />DATE: <br />17-Apr-2025 <br />24