Laserfiche WebLink
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Santa Ana Grade Sepa￿tion Santa Ana Bouleva￿ is a s￿-Jane east-west p￿ncipal a￿e￿al and <br />ca￿￿es in excess of 20,000 vehicles per day. Santa Ana Bouleva￿ <br />c￿sses the OC￿ Met￿￿nk Ra￿￿￿ad at grade, causing traffic flow <br />inte￿￿tion ￿en the t￿in is near station￿ with ￿t￿e to no pedest￿an <br />and bicycle safety or p￿tection at the c￿ssing￿ <br />Due to inc￿as￿g demand for inter￿ and in￿￿coun￿ ￿￿ se￿￿ces <br />resul￿ng ￿￿m g￿￿h ￿ popul￿￿on and emplo￿ent ￿ the su￿￿unding <br />a￿as￿ a g￿de sepa￿￿on at Santa Ana Bouleva￿ and the OC￿ <br />Met￿/￿nk Ra￿￿ad is needed to a￿eviate the c￿￿￿nt and potential t￿ffic <br />impacts and hazards posed by the existing ￿￿-g￿de ra￿ c￿ssing. This <br />p￿ject ￿￿ m￿im￿e the poten￿al con￿cts between trains and <br />pedes￿￿ans, bicyc￿sts, and vehicles wh￿e also p￿￿ding better <br />connec￿￿t￿￿ imp￿￿g air quality, enhancing emergency ￿sponse ￿me <br />and imp￿￿g the quality of ￿fe of the comm￿ni￿￿ <br />PROJECT CATEGORY: <br />Street Imp￿ve￿ents <br />Stree￿B￿dge Imp￿vements & <br />￿dening <br />￿ <br />LOCATION MAP ￿ <br />PROJECT COSTS <br />Other <br />FY 25/26 <br />75,000 <br />FY 26/27 <br />FY 26/27 <br />FY 27/28 <br />FY 27/28 <br />FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />TOTAL 75,000￿ <br />,￿￿\SOURCE OF FUNDS <br />GENE￿L FUND <br />FY 25/26 <br />75,0009TOTAL75,000 <br />AGENCY: <br />Public ￿￿ <br />DIVISION: <br />GIP Enginee￿ng <br />CONTACT: <br />Jason ￿ab￿e￿, ￿￿c￿pa￿ Civ￿ ￿gineer <br />DATE: <br />17-Apr-2025 <br />33