Laserfiche WebLink
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />￿--------------￿1 <br />PROJECT TITLE: <br />Wa￿er Ave lmpr: Ph 2 - Oak - <br />Grand <br />PROJECT DESCRIPTION:PROJECT NEED: <br />This p￿ject w￿￿ ￿den Wa￿er Avenue bet￿een Oak Street and <br />G￿nd Avenue ￿m 2 to 3 lanes in each direc￿on. ￿e project w￿ <br />also include additional le￿ tu￿ lanes at Grand Avenue, bus pads, <br />￿ised medians, and a p￿tected bike lane. <br />￿e MPAH ￿aster Plan of A￿erial High￿ays) St￿tegic ￿an Technical <br />Repo￿ identified the need for Wa￿er Avenue to be ￿idened to a s￿- <br />lane m￿or a￿erial to meet MPAH ￿quirements￿ The existing Ave￿ge <br />Da￿￿ ￿￿￿c ￿DT) is in excess of 29,600 vehicles per day. The <br />proposed imp￿vements w￿ a￿o￿ the segment ￿o accommodate ￿ture <br />￿￿￿c volumes at a Level of Service A and inc￿ase ope￿tional <br />e￿ciency. <br />PROJECT CATEGORY: <br />Street Imp￿vements <br />Stree￿B￿dge Imp￿vements & <br />￿dening <br />LOCATION MAP <br />PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />Constructio n 29,680 <br />TOTAL 29,680 <br />SOURCE OF FUNDS <br />SELECT STREET CONSTRUCTION <br />M2 LOCAL FAIRSHARE <br />FY 25/26 <br />373 <br />FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />·---- <br />- <br />29,307 <br />￿•￿ <br />- <br />TOTAL 29,680 <br />￿i / <br />--"- <br />AGENCY: <br />Public ￿￿ <br />DIVISION: <br />GIP Enginee￿ng <br />CONTACT: <br />Alex Bangean, Senior Civ￿ Engineer <br />DATE: <br />17-Apr-2025 <br />34