My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet 5.12.25
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2025
>
Packet 5.12.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:50:58 AM
Creation date
9/2/2025 9:48:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />PROJECT TITLE: <br />Badway Multi-Modal Stet <br />Improvements <br />PROJECT DESCRIPTION:PROJECT NEED: <br />Pject wi consct a class I and/or class IV bikeway on Baway <br />Stet m Santa Cla Avenue to Mainplace Drive. Wo w <br />inclue mong one vehicular lane orer to constct the <br />bikeway. Aitional work inclues siewalk eng, cu an <br />gue, stet work an tc signal moifications. <br />ect is neee to in a beway gap an connue completing the <br />golen loop in this aa <br />PROJECT CATEGORY: <br />c Impments <br />c SaI Mobility <br />LOCATION MAP <br />\ <br />PROJECT COSTS <br />Engineering <br />FY 25/26 <br />26,000 <br />FY 26/27 <br />FY 26/27 <br />FY 27/28 <br />FY 27/28 <br />FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />TOTAL 26,000 <br />SOURCE OF FUNDS FY 25/26 <br />TRANSPSYSTEMIMPR <br />V <br />26,000 <br />AREA <br />TOTAL 26,000 <br />AGENCY: <br />Public <br />DIVISION: <br />c gineeng <br />CONTACT: <br />Ruben Castaneda, Senior gneer <br />DATE: <br />17-Apr-2025 <br />42
The URL can be used to link to this page
Your browser does not support the video tag.