Laserfiche WebLink
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />￿--------------￿1 <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Grand Ave Sto￿ D￿in This p￿ject includes the ￿placement of an exis￿ng sto￿ ￿￿in <br />system consis￿ng ofa 4'x 8'catch basin, 2 - 18"x 11" a￿hed <br />co￿￿gated metal pipes (CMP)￿ and a 29￿￿18" arched CMP storm <br />d￿inpipe. The system connects to an existing 8' x 10'sto￿ drain <br />box at Grand Avenue no￿h of Dyer Road. ￿e p￿posed sto￿ d￿in <br />￿e exis￿ng sto￿ d￿in system has sustained significant damage ￿m <br />co￿￿sion ￿imi￿ng its ab￿i￿ to manage sto￿ water runoffin the a￿a￿ <br />￿is inc￿ases the ￿sk oflocal flooding, which can ￿s￿pt t￿￿c flow <br />and cause ￿￿her damage to su￿￿un￿g p￿pe￿ies and ￿ad￿ys￿PROJECT CATEGORY: <br />Ut￿￿rainag￿/Lighting <br />Improvements system w￿ consist ofa 4￿x 8￿catch basin, 2 - 12" ￿in￿￿ed <br />concrete pipes (RCP)￿ a ￿unc￿on st￿cture￿ and an 18" RCP￿ <br />Sto￿ D￿i￿￿ater Quality <br />LOCATION MAP <br />I <br />PROJECT COSTS FY 25/26 <br />450,000 <br />450,000 <br />FY 26/27 <br />FY 26/27 <br />FY 27/28 <br />FY 27/28 <br />FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />Engineering <br />TOTAL <br />SOURCE OF FUNDS FY 25/26 <br />OAF: DA-3 450,000 <br />TOTAL 450,000 <br />AGENCY: <br />Public ￿￿ <br />DIVISION: <br />GIP Enginee￿ng <br />CONTACT: <br />Ma￿ Canta, Senio￿ Civ￿ ￿ginee￿ <br />DATE: <br />17-Apr-2025 <br />43