Laserfiche WebLink
Public Works Development <br />Engineering Comments <br />MEMORANDUM <br />To: <br />Fernanda Arias <br />Planning & Building Agency Date:February 9, 2023 <br />Samar Elsayegh <br />From: Public Works Agency <br />Subject: DP #2023-002 AT 2938 SOUTH DAIMLER STREET; AP #430-173-16 <br />PURPOSE: THE APPLICANT, STEVE LEE, REPRESENTING ANCHOR STONE CHRISTIAN <br />CHURCH, IS PROPOSING TO OCCUPY EXISTING 3,843 SQ. FT. OF OFFICE <br />SPACE AS A CHURCH. THE CHURCH’S OPERATION HOURS WILL BE <br />MONDAY TO FRIDAY FROM 9AM TO 5PM. SATURDAY FROM 10AM TO 7PM. <br />AND SUNDAY FROM 9AM TO 4PM. ADDITIONALLY, THEY WILL HOLD MASS ON <br />SPECIAL HOLIDAYS AND BIBLE SCHOOL FOR A WEEK DURING THE <br />SUMMER. THIS PROJECT WILL REQUIRE ADMINISTRATIVE APPROVAL OF <br />THE DEVELOPMENT PROJECT REVIEW AND DISCRETIONARY APPROVAL OF <br />A CONDITIONAL USE PERMIT. <br />PROJECT: ANCHOR STONE CHRISTIAN CHURCH <br />The Public Works Agency has reviewed the proposed project. To ensure that the requirements of <br />the Santa Ana Municipal Code are met, the developer must obtain approvals from the Public Works <br />Agency at four different phases of the development process – A) Prior to Site Plan Approval; B) <br />Prior to Submittal into Building plan check; C) Prior to Issuance of a Building Permit; and <br />D) Prior to release of utilities or a certificate of occupancy. Requirements from the Water <br />Resources Department are listed after Section “D” of this memo. The details of all approvals are <br />as follows: <br />A.Prior to site plan approval, complete the following: <br />1.If applicable and requested herein as a requirement for Site Plan Approval, submit Public <br />Works Agency (PWA) requested documents, including preliminary WQMP, WQMP, <br />preliminary surface drainage plans, preliminary grading plan, street improvement plan, <br />traffic impact analysis, traffic control study, drainage study, and hydrological study directly <br />to PWA Development Engineering. Pay all related plan checking deposits for such <br />documents at the Public Works counter at the time of submittal. <br />2.Provide a site plan to depict and dimension all existing topography, within the public right- <br />of-way, along the property frontage including all access points from the public street <br />(driveways approaches), trees, street signs, streetlights, etc. NOTE: An aerial image <br />cannot be submitted as a Site Plan. For additional information or an example of a Site <br />Plan, please contact the Planning and Building Agency. <br />