My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet 7.14.25
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2025
>
Packet 7.14.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:58:44 AM
Creation date
9/2/2025 9:57:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a.A Certificate of Insurance of general liability containing requirements as set forth by <br />the City Attorney. <br />b.A Contractors license (with approved classification). <br />c.Proof of Worker’s Compensation Insurance. <br />d.Three (3) sets of the approved street improvement plans. <br />e.If there are any new connections to the City’s water main, provide plans and an <br />approved application for installation of water service. For a list of information needed <br />for an application, contact the Water Resources Division by phone at 714-647-3320 or <br />by email at waterinfo@santa-ana.org. <br />7.Should the developer seek a building permit release prior to completing the off-site <br />improvements, the developer must provide a cash deposit or surety bond in an amount <br />specified by the City of Santa Ana upon approval of all improvement plans and approval <br />of itemized cost estimate. The cash deposit or the surety bond shall guarantee the <br />construction of all necessary improvements. The cash deposit shall be released <br />approximately 135 days after all related permits are signed off by the City’s Construction <br />Inspector, approval by the City of Santa Ana, and the passage of any lien periods. In the <br />event the work is not completed within one year of the date that a street work permit is <br />signed, applicant agrees that the City may apply the cash deposit to the cost of completing <br />the work and such work may be completed at the sole convenience of the City of Santa <br />Ana. The deposit amount will be determined based upon the surface drainage and street <br />improvement plans. <br />D.Prior to release of utilities or a certificate of occupancy, complete the following: <br />1.Complete construction of all the required improvement in the public right-of-way and <br />provide a copy of the signed off street work permit <br />Please contact Samar Elsayegh at (714) 647-5034 for assistance regarding the above requirements. <br />T:\DevelopmentServices\DevelopmentProjects\DaimlerS2938_23- <br />002_AnchorStoneChristianChurch_SE\2938 Daimler\MEMO_DaimlerS2938_23- <br />002_AnchorStoneChristianChurch_SE.docx <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.