Laserfiche WebLink
Public Work Traffic Comments <br />MEMORANDUM <br />To:Samar Elsayegh <br /> Development Engineering <br />Date:February 16, 2023 <br /> <br />From:Ruben Castaneda <br /> Traffic Engineering <br />Subject:DP # 2023-002; Anchor Stone Church; <br /> 2938 SOUTH DAIMLER STREET –TRAFFIC ENGINEERING COMMENTS <br />This memo is in response to proposed development project application for subject project. <br />Traffic Engineering Items <br />•Project does not generate enough traffic to trigger a traffic study. However, a focus site <br />access study will be required in particularly line of sight, planned operations (dates, times, <br /># of expected participants). <br />•If CEQA is required. VMT analysis will be needed. <br />Street Light Items <br />•Installation/replacement of one (1) new streetlights in front of property frontage on <br />Daimler St per approved street improvement plans and City standards”. Work shall <br />include conduit, conductors, street lights and service pedestal, as needed. City street light <br />standards are available on the City website. Contact Cesar Rodriguez at (714) 647-5626 <br />for street light questions. <br />•For street lights provide: <br />o Provide street light plans showing service point, pedestal, conduits, wires, street <br />light locations, etc. <br />o Provide SCE service point drawing; <br />o Provide as-built. <br />Feel free to call me at (714) 647-5621 or email me at rcastaneda@santa-ana.org if you have any <br />questions or if you would like to discuss. <br />