Laserfiche WebLink
e. Relevant Proiect Experience: <br />City of Santa Ana <br />City of Santa Ana San Lorenzo Lift Station (2020-2023) <br />Worked with Leed Electric to provided Turnkey Lift Station RTU control panel build, PLC and HMI, <br />Programming, Radio Site Survey, Control Panel FAT, 10 Check Out startup and commissioning. All work <br />was done to COSA automation standards. System controlled 3 lift station sewage pumps, with grinders. <br />Instruments included flow, pressure, level, and intrusion. Modicon M340 PLC with Magelis HMI. GE <br />900Hz radio. Coordinated and tested SCADA communications with COSA staff. <br />City of Santa Ana Well 29 Improvements (2023-Present) <br />Worked with Leed Electric to provide Well 29 Well RTU control panel build, PLC and HMI, Programming, <br />Control Panel FAT, 10 Check Out startup and commissioning. All work was done to COSA automation <br />standards. System controlled well pumps, with valves. The system monitored Instruments included <br />flow, pressure, level, motor vibration, intrusion, and generator/ATS Modicon M340 PLC with Magelis <br />HMI. GE 900Hz radio. Coordinated and tested SCADA communications with COSA staff. <br />City of Santa Ana Well 32 Rehabilitation (2023-Present) <br />Worked with Southern Contracting to provided Well 32 Well RTU control panel build, PLC and HMI, <br />Programming, Control Panel FAT, 10 Check Out startup and commissioning. It also included Garthe RIO- <br />100, security and communication racks. All work was done to COSA automation standards. System <br />controlled well pump, and with valves The system monitored Instruments included flow, pressure, level, <br />motor vibration intrusion, analyzers and generator/ATS. Modicon M340 PLC with Magelis HMI. GE <br />900Hz radio. Coordinated and tested SCADA communications with COSA staff. <br />City of Santa Ana Garthe Pump Station RTU-2 (2024-Present) <br />Worked with Leed Electric to provided Garthe Pump Station RTU-2 control panel build, PLC and HMI, <br />Programming, Control Panel FAT, 10 Check Out startup and commissioning. It also included Garthe RIO- <br />100, security and communication racks. All work was done to COSA automation standards. System <br />controlled reservoir level control, well pump calls, distribution pumps, with valves and hypo dosing. The <br />system monitored Instruments included flow, pressure, level, motor vibration intrusion, analyzers and <br />generator/ATS. Modicon M340 PLC with Magelis HMI. GE 9001-lz radio. Coordinated and tested SCADA <br />communications with COSA staff. <br />9 1 P a g e <br />