Laserfiche WebLink
KDC SyAws <br />An FMCCR Company <br />2.1. Key Personnel <br />KDC Systems would assign the following team to support the City of Santa Ana: <br />Ed Kazimierski <br />General Manager <br />PRIMARY CONTACT <br />Lukasz Niedojadlo Greg Es❑ James Westerfield <br />Program ►Nanager Engineering Mngr Business Development <br />r <br />Tuan Le Franc tsco Valdez Eric Kosalka Mike Gomez <br />Senior Engineer Engineer 11 Engineer 11 CAD Designer <br />Our philosophy is to have a group of engineers familiar with a supported facility. All <br />assigned Engineers will familiarize themselves with City of Santa Ana engineering standards <br />and facilities. All team members are locally based and work from our facility in Los Alamitos. <br />See Resumes --APPENDIX A <br />2.2. Panel Fabrication <br />KDC Systems operates a 1000 square foot UL508A / UL-698 fisted Panel Shop. This is located <br />within our headquarters in Los Alamitos. <br />Building our own panels enables close collaboration between our engineering team and our <br />fabrication team. Engineers supervise the fabrication of their panels and can also support <br />testing. We build panels of the highest quality and generally exceed our customers' <br />expectations. References are available. <br />2.3. Training Room <br />KDC Systems has built a Training Room at our headquarters in Los Alamitos. This facility is <br />ideal for providing customer training. We also use this facility for design Workshops. <br />= 18 <br />KDC Systems <br />An EMCOR Company <br />