My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreement for Kraemer Boulevard, Glassell Street, Grand Avenue Corridor Regional Traffic Signal Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 16 - Agreement for Kraemer Boulevard, Glassell Street, Grand Avenue Corridor Regional Traffic Signal Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:22:27 AM
Creation date
9/10/2025 8:36:34 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) <br />CITY OF SANTA ANA <br />Traffic signals to be synchronized along the corridor are controlled by the individual Agency owners. The <br />Agencies along the corridor utilize several different types of controller assemblies. Controller Unit types <br />employed within the assemblies may include various proprietary pre -Advanced Transportation <br />Controllers (ATC) each having their own respective firmware/operating systems and characteristics; and, <br />some of the newer ATC which is now a requirement of the Comprehensive Transportation Funding <br />Program (CTFP) Guidelines. The respective Agencies also interface these controllers utilizing unique <br />Advanced Transportation Management Systems (ATMS) or Master Central Systems. Per CTFP <br />Guidelines, all ATMS to be installed or modified must comply with all applicable NTCIP standards for <br />communications. <br />SCOPE OF WORK <br />The City of Santa Ana desires to retain an experienced firm (Design -Build Entity) to implement the Kraemer <br />Boulevard/ Glassell Street/ Grand Avenue corridor Regional Traffic Signal Synchronization Project, <br />approved by Orange County Transportation Authority (OCTA) as part of the 2024 Project P corridors from <br />Renewed Measure M (M2). The City intends to enter into an agreement with the selected Firm for the <br />services described herein and agreed to by both parties. Although the full scope of work shall be <br />negotiated in the Design -Build Contract, as described herein, the selected Design -Build Entity will be <br />expected to fulfill, at a minimum, the services and technical requirements described in the Scope of Work. <br />The project length is approximately 15.14 miles and includes 61 signalized intersections, starting from <br />Lambert Road in the City of Brea to Dyer Road in the City of Santa Ana (Attachment A- Project Map and <br />Intersection List). The participating agencies are the Cities of Brea, Placentia, Anaheim, Orange, Santa <br />Ana and the California Department of Transportation. Caltrans is a participating agency in the project and <br />the participating Cities are committed to executing a cooperative agreement with Caltrans for the <br />implementation of optimized signal timing at the Caltrans intersections. There are no proposed physical <br />improvements at the Caltrans signals. <br />The goals of the project are to implement all the required timing and traffic signal improvements identified <br />in the Improvement List (Scope of Work- Attachment B), to improve traffic flow, reduce stop and minimize <br />congestion on the Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor. The scope of work includes <br />but not limited to the followings: <br />• Provide project and contract management throughout the project duration. <br />• Provide timing and operation analysis, develop and implement optimized traffic signal <br />synchronization timing for the corridor. <br />• Provide engineering services to prepare plans, specifications and estimates for traffic signal <br />equipment and related infrastructure improvements. <br />• Upon approval by the owning Agencies and City of Santa Ana, procure, furnish and install all <br />approved infrastructure improvements for project. <br />• Provide construction management services to oversee the improvement implementations of the <br />project. <br />• Provide ongoing signal timing and maintenance support for 2-year after initial implementation of <br />the timing. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.