Laserfiche WebLink
(9) <br />CITY OF SANTA ANA <br />3. Ideally, the analysis should include the floating car data and data collected as <br />part of Task 2. However draft versions of the report can include previously <br />collected traffic, travel time, or other data, if considered relevant and available, <br />until the full set of data collected by CONSULTANT as part of Task 2 is available. <br />4. The memorandum shall provide a very good understanding of traffic patterns on <br />PROJECT throughout the weekdays and throughout the weekend. The <br />CONSULTANT shall perform due diligence with regard to existing and proposed <br />timing operations on arterials that intersect with the PROJECT. <br />5. Tru-Traffic has the OCTA CSPI calculation formulas available for use, as well as <br />the calculations for the latest emissions for GHG and other MOE's. <br />6. CONSULTANT shall finalize the memorandum based on comments received <br />from Santa Ana and other involved agencies. <br />G. Consultant shall present to the project team the traffic patterns on project scope and <br />possible synchronization strategies to address the traffic patterns (optimizing the fill <br />corridor versus optimizing segments identified with natural traffic breaks) to provide <br />direction on the preferred signal timing strategy. Any requested presentation shall <br />include as much of the turning movement, 24-hour machine counts, travel time, earlier <br />city counts, etc. as available. <br />Sub -Task 2.: 'After' Travel Time Studies <br />Following the implementation of all system and timing enhancements, consultant shall schedule <br />'After' travel time studies to measure the effectiveness of the project. <br />Since the Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor is part of the OCTA <br />Countywide Baseline Project, OCTA is currently collecting data, developing traffic signal <br />synchronization timing, and will implement and fine tune new timing for all the fifty-seven (57) <br />agency signals along this corridor, except the Caltrans signals. The Consultant shall coordinate <br />the After Travel Time Studies with OCTA's Countywide Baseline Project. <br />A. The consultant shall conduct an 'After' field study representative of the times and days <br />for which synchronization plans were developed. The 'After' study must be conducted in <br />the same manner and contain the same MOE's as the'Before' study in order to evaluate <br />the improvements of the synchronization plans. <br />B. At least five (5) runs will be completed in each direction for each of the three weekday <br />timing plans (AM, mid -day, and PM), and at least five (5) runs will be completed in each <br />direction during the Saturday midday plan. <br />C. Project travel -time data shall be collected using the floating car method, a laptop <br />computer, a GPS receiver unit, and the methodologies and software to match the <br />'Before' study, exactly. MOE's should be compiled for the optimized corridor using the <br />floating car method output in IatestTru- Traffic and then from Synch ro/SimTraffic. <br />9 <br />