My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreement for Kraemer Boulevard, Glassell Street, Grand Avenue Corridor Regional Traffic Signal Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 16 - Agreement for Kraemer Boulevard, Glassell Street, Grand Avenue Corridor Regional Traffic Signal Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:22:27 AM
Creation date
9/10/2025 8:36:34 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) <br />CITY OF SANTA ANA <br />D. Consultant shall prepare a memorandum comparing the results of the 'Before' and 'After' <br />field study with reference to the specific MOE's. The report shall specifically give data on <br />total project cost for the PI along with a one-year and three-year projection on benefit to <br />cost. Consultant shall present the findings to the Board. <br />E. Consultant shall finalize the memorandum based on comments from City of Santa Ana <br />and involved agencies. GHG calculations shall be performed and incorporated into the <br />memorandum and Final Report. <br />City of Santa Ana may request a presentation on the comparison of the 'Before' and 'After' <br />conditions along the PROJECT. Any requested presentation shall include visuals and short <br />summaries of overall project achievements that can be quickly understood by staff of all levels. <br />Deliverables - Task 2: <br />1. Report summarizing data collection and field review efforts, including intersection turning <br />counts, traffic collision analysis, current traffic signal timing patterns, drawings and photos <br />of intersection features, and recommended mitigations to perceived problems. <br />2. Deliverable of drawings, photos, and counts to Agencies shall be limited to political <br />boundaries. <br />3. Draft and Final Memorandum documenting the results of the 'Before' study is to be <br />distributed to City of Santa Ana and Partner Agencies as a discussion item. <br />4. Draft and Final Memorandum comparing the results of the 'Before' and 'After' studies, <br />including benefit -to -cost ratio, to be distributed to City Santa Ana and Partner Agencies as <br />a discussion item. <br />5. Electronic versions of all data files and memorandum to City Santa Ana and Partner <br />Agencies. <br />6. Presentation to the City Santa Ana and Partner Agencies of the 'Before' and 'After' study <br />comparison. <br />III. Task 3: System Design and Construction <br />If deemed necessary by City of Santa Ana or through request of a Partner Agencies, consultant <br />shall prepare any design construction documents in the form of sketches to full-fledged Plans, <br />Specifications, and Estimates (PS&E). Consultant shall prepare such plans for use in the <br />construction of the project per each respective agency standards. Consultant shall supply such <br />documentation to City of Santa Ana and the agency owning the affected facility for approval prior <br />to commencing any construction. <br />Sub -Task 3.1: Design Plans and Standards <br />Consultant will be required to design, procure, install, construct, and implement all desired <br />components of the project as described in List of Improvement (Scope of Work- Attachment B). <br />At a minimum, consultant shall generate design plans as follows to ensure appropriate <br />construction documents are developed to capture all improvements desired by the Agencies. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.