My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreement for Kraemer Boulevard, Glassell Street, Grand Avenue Corridor Regional Traffic Signal Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 16 - Agreement for Kraemer Boulevard, Glassell Street, Grand Avenue Corridor Regional Traffic Signal Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:22:27 AM
Creation date
9/10/2025 8:36:34 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9)CITY OF SANTA ANA <br />A. Consultant will work directly with City of Santa Ana and Agencies at the outset of <br />conceptual design to affect the most cost effective and time sensitive approach to design <br />plans. <br />B. Consultant shall coordinate with each Agency of the project to assess special construction <br />requirements, needs and desires, either known and proposed or previously unforeseen or <br />unknown but necessary to complete the project. <br />Conduct all required utility research and coordination for project, including <br />ownership, information requests, preliminary notices and final notices. The <br />Consultant shall identify any required relocations. <br />2. Survey existing conditions to locate existing improvements. Survey data collection <br />should extend outside project limits sufficiently to plot joins to existing <br />improvements, verification of unimpeded intersection sight distance triangles, and <br />others. <br />3. Existing right-of-way limits and easements shall be identified and shown. Any <br />required temporary construction easements shall be identified. <br />4. Prepare and submit permit applications to each regulatory agency required for plan <br />approvals. Permit application fees will be paid by the City with proper <br />documentation. <br />Anticipated permits: <br />1. Encroachment permits from Caltrans <br />2. No -fee encroachment permits for work within each Partner Agency's <br />right-of-way. May require obtaining a City Business license for each <br />respective Agency. <br />5. Individual agency design blocks (if available), preferences, standard plans and <br />specifications will be provided to the awarded consultant. <br />C. Consultant shall provide design services for interconnect plans along the project route. <br />The interconnect plans may be submitted as high quality detailed aerial plans at 1" = 40' <br />scale. The plans shall include, but not be limited to, all utilities, locations of control and <br />communications cabinets, conduit runs, pull boxes, R/W and roadway centerlines, North <br />Arrow, etc. The interconnect plans shall also provide terminations details at each <br />signalized intersection and show the communication path from each intersection to a <br />communications hub (if any) and to the appropriate Agency Traffic Management Center <br />(TMC). All connections and terminations shall be indicated. <br />D. Consultant shall provide design services for traffic signal modification plans at <br />intersections where minor phasing or other electrical changes require an "as -built" drawing <br />record change for the intersection. Plans shall be drawn at 1 "= 20' scale and include all <br />details described in (B) above. <br />E. Plans shall be prepared in the latest version of MicroStation and/or AutoCAD software. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.