Laserfiche WebLink
(9) <br />CITY OF SANTA ANA <br />A. Only when Agency and City of Santa Ana approves final design plans or provide written <br />approval to proceed with system construction and integration, shall consultant begin the <br />procurement and mobilization of system improvements on project. <br />B. Consultant shall work directly with City of Santa Ana and affected Agencies to schedule, <br />construct, and inspect the improvements implemented for this project. <br />NEC Certification is required for all persons who perform work as electricians for <br />contractors licensed as Class C-10 electrical contractors under the Contractor's <br />State License Board Rules and Regulations. <br />2. The contractor shall keep the traffic signal system in operations at all times during <br />construction except for the approved switchover shutdowns described below. <br />3. Traffic Signal shutdown shall be limited to four-hour periods between the hours of <br />9:00 a.m. and 3:00 p.m. on weekdays (Monday through Thursday), except as <br />authorized by owning Agency. <br />4. Turn -on of new or rewired traffic signals, or those with a new controller cabinet <br />shall only be scheduled for hours between 9 a.m. and 12 p.m. and shall not begin <br />the functional test on a Friday, weekend, holiday or any day preceding a holiday, <br />except as authorized by owning Agency. The Inspector shall be notified at least <br />five (5) working days before the intended turn -on and provide method and <br />schedule of turn -on procedure. <br />5. The Inspector shall be notified a minimum of two work days in advance of planned <br />connection of the new or modified traffic signal to the traffic signal communications <br />system, if the new or modified traffic signal is to be connected to the traffic signal <br />communications system. <br />6. The contractor shall submit material submittals for approval prior to the start of <br />construction or some cases, before manufacturing. <br />7. The Contractor shall be responsible for all electrical service details, coordinating <br />and scheduling of work and necessary connections in advance of need. <br />8. The Contractor may perform sub -surface work consisting of the installation of <br />conduit, and foundations, prior to receipt of all electrical materials and equipment. <br />9. Above -ground signal work shall not commence until such time that the contractor <br />notifies the City of Santa Ana, in writing, of the date that all electrical materials and <br />equipment are received and said work shall start within 15 days after said date. <br />10. All excavated material shall be removed from the site and backfilled with <br />compacted crushed aggregate base material topped with temporary asphalt <br />concrete on the same working day as removed. <br />13 <br />