(9)CITY OF SANTA ANA <br />11. All striping, pavement markings, and signing shall be in place prior to signal turn - <br />on and/or opening of street to public travel. <br />C. Consultant shall be responsible for performing or scheduling necessary testing, as <br />specified by the Caltrans Standard Specifications, of all equipment procured for project. <br />All performance testing relative to tasks performed on this project shall be <br />performed by an inspector determined by the owning Agency of the equipment <br />being delivered or installed. <br />2. Testing of any traffic controller assemblies or traffic controller units shall be done <br />per the policy at the direction of the owning Agency. All costs involved with testing <br />shall be borne by the consultant. <br />D. Unless noted by owning Agency or City of Santa Ana, consultant shall be responsible for <br />the configuration and integration of all devices implemented on project. <br />E. Consultant shall provide Agencies with construction management support throughout the <br />system construction stage of project. <br />The Consultant shall provide professional construction management services, including <br />inspection, quality control, Critical Path Method (CPM) schedule management, utility <br />coordination, and administration services during construction. Work shall be performed in <br />accordance with City of Santa Ana standards of practice. <br />The Consultant shall respond to all requests for information (RFIs), review shop drawing <br />and material submittals, plans, and any other Project related documents. The Consultant <br />shall assist the City with reviewing and negotiating proposed Construction Change Orders. <br />The Consultant is expected to support the Project Construction Contractor with system <br />integration (including, but not limited to installing/implementing and integrating all <br />hardware and software) during the construction phase of the project. The Consultant is <br />expected to coordinate with the Construction Contractor for installing and/or integrating <br />new traffic signal controllers and cabinets, communication hardware, communication <br />equipment, ITS equipment, etc. <br />During construction, each agency will provide construction inspection services for those <br />components subject to agency inspection. However, overall construction management will <br />be required of the Consultant. Construction management services include Pre - <br />Construction meeting, <br />Construction Phase: <br />1. Arrange and conduct Pre -Construction meeting, <br />Inspector, public utilities, private entities, general <br />stakeholders. Prepare minutes of Pre -Construction <br />attendees. <br />2. Provide and maintain sufficient field personnel <br />construction. <br />14 <br />inviting the Project Manager, <br />contractor and other project <br />meeting for distribution to all <br />to administer and manage <br />