My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreement for Kraemer Boulevard, Glassell Street, Grand Avenue Corridor Regional Traffic Signal Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 16 - Agreement for Kraemer Boulevard, Glassell Street, Grand Avenue Corridor Regional Traffic Signal Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:22:27 AM
Creation date
9/10/2025 8:36:34 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kraemer Boulevard, Glassell Street, Grand Avenue Corridor Regional Traffic Signal <br />Synchronization Project <br />September 16, 2025 <br />Page 4 <br />Project Schedule and Contract Time <br />The project will be implemented in two phases, Primary Implementation (PI) and <br />Operations & Maintenance (O&M). The Primary Implementation phase will design and <br />construct the improvements along with Signal Timing Implementation. Once the PI <br />phase is complete, a subsequent two (2) year O&M period will provide continued <br />support and finetuning of the newly implemented optimized timing. The two-phase <br />approach will accomplish the scope of work as outlined in the grant documents. The <br />consultant is responsible for determining the scheduling and sequencing of activities <br />based on their proposed means and methods to complete both phases in the time <br />allotted. <br />System construction is estimated to be completed September 2026, barring <br />unforeseeable conditions such as rain, natural disasters, or other delays beyond the <br />control of the City and of the Contractor. O&M is estimated to be completed September <br />2028 which will provide two (2) years of support and finetuning of the newly <br />implemented optimized timing. The design -build contract will provide both design and <br />construction services, streamlining the project delivery from start to finish. <br />The actual completion date will depend on the consultant's schedule, material <br />procurement timelines, and any unforeseen delays. Based on a typical project timeline, <br />the estimated project completion is provided below; <br />Project Milestones <br />Milestone <br />Estimated <br />Notes <br />Completion Date <br />Primary Implementation <br />September 2026 <br />(PI)- Phase 1 <br />Data Collection <br />December 2025 <br />Field Review, Traffic Counts,Before <br />and After Studies <br />Signal Timing Optimization <br />Concept of Operations, <br />and Implementation <br />September 2026 <br />Optimized Timing, Field <br />Implementation, Fine Tuning <br />Project Report <br />September 2026 <br />Executive Summary <br />Design Plans and <br />System Design and <br />Specifications, Material <br />Construction <br />September 2026 <br />Procurement, Construction, <br />Construction Administration, <br />Inspections <br />Operation & Maintenance <br />September 2028 <br />O&M - Phase 2 <br />Continuing Support <br />September 2028 <br />On Call Signal System and <br />Timing Support <br />
The URL can be used to link to this page
Your browser does not support the video tag.