My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:24:57 AM
Creation date
9/10/2025 8:37:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For typical projects, of size and quantities, in the City of Santa Ana the following "Frequency <br />Table" shall be the material sampling and testing minimum standards. A final, bound/stamped, <br />laboratory report is to be supplies to the Resident Engineer and retained in the project records. <br />XII. ASPHALT CONCRETE PAVEMENT <br />• Plant inspection for daily quantities of 500 tons or more. <br />o One per project minimum. <br />Test Required: <br />o Aggregate prior to mixing, per 1000 tons <br />■ % crushed particles <br />■ Sieve analysis <br />■ Sand equivalent <br />o Combined Mixture, per 1000 tons <br />■ Stabilometer <br />■ Asphalt oil content <br />■ Maximum density <br />■ In -place density <br />o Liquid Asphalt <br />■ Certificate of Compliance <br />Field Compaction: <br />o Tests shall beat 200' to 400' intervals in each lane paved. Tests shall betaken in each <br />layer placed. <br />City of Santa Ana Quality Assurance Program 2020 <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.