My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:24:57 AM
Creation date
9/10/2025 8:37:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual <br />Exhibit 16-T1 <br />Materials Requiring a Certificate of Compliance per Caltrans Standard Specifications <br />Exhibit 16-T1 Materials Requiring a Certificate of Compliance per Caltrans Standard Specifications <br />Table 6-2.3 Materials Accepted by Certificate of Compliance (1 of 7) <br />Material/Product <br />Remarks (Including Requirements for Additional Back -Up Information <br />Required with Certificate of Compliance) <br />Asphalt <br />Certificate of compliance must include the following: <br />1. Shipment number and shipment date. <br />2. Source refinery, consignee, and destination. <br />Asphaltic emulsion <br />3. Type and description of material with specific gravity and quantity. <br />4. Contract or purchase order number. <br />5. Signature by the manufacturer of the material and a statement that the <br />material complies with the contract. <br />Asbestos cement pipe <br />Asbestos sheet packing <br />Asphalt modifier <br />Test results required with each truck load. <br />Asphalt rubber joint sealant <br />A certified test report of the results for the required tests performed within 12 <br />months before the proposed use. <br />Backer rods <br />Must include manufacturer's statement of compatibility with the joint sealant to be <br />used. <br />Barbed Wire <br />Blast cleaning material <br />Bonding Material <br />Brick <br />Cable -type restrainers <br />Certificate of compliance must be submitted with a copy of each required test <br />Lock nuts <br />report. <br />Cast iron pipe <br />Cast iron manhole rings and covers <br />Chemical adhesive for bonding tie <br />bars and dowel bars in concrete <br />pavement <br />Chemical adhesive for structures <br />Certificate of compliance must state compliance with ICBO AC 58 and <br />Caltrans. Augmentation/Revisions to ICBO AC 58. <br />Concrete <br />Certificate of compliance from the manufacturer must certify that the <br />admixture furnished is the same as that previously authorized or the <br />Admixture <br />authorized materials list. <br />Certificate of compliance must include the source name and location. <br />If the cementitious material is delivered directly to the job site, the certificate of <br />compliance must be signed by the cementitious material supplier. <br />Concrete Cementitious <br />If the cementitious material is used in ready -mixed concrete, the certificate of <br />material <br />compliance must be signed by the concrete manufacturer. <br />If blended cement is used, the certificate of compliance must include a <br />statement signed by the blended cement supplier that shows the actual <br />percentage of SCM, by weight, in the blend. <br />Certificate of compliance must include: <br />Concrete <br />1. Test results for the tests specified in Section 90-1.01 D(6) [90-7.01 B] of the <br />Curing compound <br />Standard Specifications. <br />2. Certification that the material was tested within 12 months before use. <br />Before placing minor concrete from a source not previously used on the <br />Concrete Minor <br />contract, a certificate of compliance stating that the minor concrete to be <br />concrete <br />furnished complies with the contract requirements, including the specified <br />minimum cementitious material content. <br />Ceramic tile <br />Chain link fencing and railing <br />Certificate required for protective coating system. <br />Concrete anchorage devices <br />Page 1 of 7 <br />January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.