My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:24:57 AM
Creation date
9/10/2025 8:37:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual <br />Exhibit 16-T1 <br />Materials Requiring a Certificate of Compliance per Caltrans Standard Specifications <br />Table 6-2.3 Materials Accepted by Certificate of Compliance (2 of 7) <br />Material/Product <br />Remarks (Including Requirements for Additional Back -Up <br />Information Required with Certificate of Compliance) <br />Certificate of compliance must: <br />Concrete pipe <br />1. Be signed by the manufacturer's quality control representative. <br />Circular reinforced direct design <br />2. State that all materials and workmanship comply with the <br />method <br />specifications and authorized shop drawings. <br />Copper pipe <br />Corrugated metal pipe <br />Certificate of compliance must include: <br />1. Manufacturer's name <br />2. Production location <br />3. Product brand or trade name <br />4. Product designation <br />5. Batch or lot number <br />Crack sealant <br />6. Crack treatment material type <br />7. Contractor or subcontractor name <br />8. Contract number <br />9. Lot size <br />10. Shipment date <br />11. Manufacturer's signature <br />Crash cushions <br />Crumb rubber modifier <br />Test results required with each truck load. <br />Culvert markers <br />Certificate of compliance required for: <br />Delineators <br />1. Metal target plates <br />2. Enamel coating <br />3. Retroreflective sheeting <br />Dowel bar baskets <br />Drop inlet grates and frames <br />Drain tile <br />Drip irrigation line <br />Elastomeric Bearing Pads <br />Certified test results for the elastomer. <br />Plain <br />Elastomeric Bearing Pads <br />Certified test results. <br />Steel -reinforced <br />Electrical <br />Certificates of compliance is required for: <br />External cabinet <br />Battery back-up system <br />• Batteries <br />Electrical <br />Conductor <br />Electrical <br />Conduit(galvanized andplastic) <br />Electrical <br />Equipment <br />Electrical <br />Pull boxes concrete and plastic <br />Electrical Service <br />cabinets <br />Page 2 of 7 <br />January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.