Laserfiche WebLink
Local Assistance Procedures Manual <br />Exhibit 16-T1 <br />Materials Requiring a Certificate of Compliance per Caltrans Standard Specifications <br />Table 6-2.3 Materials Accepted by Certificate of Compliance (6 of 7) <br />Material/Product <br />Remarks (Including Requirements for Additional Back -Up Information <br />Required with Certificate of Compliance) <br />Sheet metal <br />Certificates of compliance required for: <br />1. Aluminum sheeting <br />Sign panels <br />2• Retroreflective sheeting <br />3. Screened -process colors <br />4. Nonreflective, opaque, black film <br />5. Protective -overlay film <br />Silicone joint sealant <br />A certified test report of the results for the required tests performed within 12 <br />months before the proposed use. <br />Slotted edge drain <br />Snow poles <br />Snow plow deflectors polyethylene <br />material <br />Soil amendment <br />Steel crib wall <br />Sheet metal <br />Certificates of compliance required for: <br />1. Aluminum sheeting <br />Sign panels <br />2• Retroreflective sheeting <br />3. Screened -process colors <br />4. Nonreflective, opaque, black film <br />5. Protective -overlay film <br />Silicone joint sealant <br />A certified test report of the results for the required tests performed within 12 <br />months before the proposed use. <br />Slotted edge drain <br />Snow poles <br />Snow plow deflectors polyethylene <br />material <br />Soil amendment <br />Steel crib wall <br />The certificate of compliance must be signed by the plant's QC representative. <br />The QC representative must be on record with the Department's Office of <br />Structural Materials. certificate of compliance must include: <br />1. Statement that all materials and workmanship incorporated in the work and all <br />required tests and inspections of this work have been performed as described. <br />2. Certified mill test reports for each heat number of steel pipe piles being <br />furnished. <br />Steel pipe piles <br />3, Test reports for tensile, chemical, and any specified non-destructive test <br />(NDT). <br />4. Test reports must be based on test samples taken from the base metal, steel, <br />coil or from the manufactured or fabricated piles. <br />5. Calculated carbon equivalent. The carbon equivalent may be shown on the <br />mill test report. <br />Steel sheet piling <br />Certificate of compliance required for: <br />1. Structural metal plate pipe <br />Structural plate culverts <br />2. Arches <br />3. Pipe arches <br />4. Metal liner plate pipe <br />Page 6 of 7 <br />January 2020 <br />