My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:24:57 AM
Creation date
9/10/2025 8:37:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual <br />Exhibit 16-T1 <br />Materials Requiring a Certificate of Compliance per Caltrans Standard Specifications <br />Table 6-2.3 Materials Accepted by Certificate of Compliance (7 of 7) <br />Material/Product <br />Remarks (Including Requirements for Additional Back -Up Information <br />Required with Certificate of Compliance) <br />Certificate of compliance must include: <br />1. Test reports for tensile, chemical, and any specified NDT. Test samples must <br />be taken from the base metal, steel, or from the manufactured or fabricated <br />Structural shape steel piles <br />pile. <br />2. A statement that all materials and workmanship incorporated in the work <br />and all required tests and inspections of this work have been performed <br />as described. <br />Structural composite lumber used in <br />falsework <br />Structural steel thermal spray coat <br />Wire feedstock <br />Styrofoam filler <br />Subsurface drain <br />Certificate of compliance required for: <br />Temporary concrete washout <br />• Gravel -filled bag <br />• Plastic liner <br />Certificate of compliance required for: <br />Temporary fence (Type ESA) <br />• High visibility fabric <br />• Safety caps for metal posts <br />Certificate of compliance required for: <br />• Fiber roll <br />• Safety cap for metal posts <br />Temporary linear sediment barrier <br />Silt fence fabric <br />• Sediment filter bag <br />• Foam barrier <br />• Gravel -filled bag fabric <br />Temporary railing (Type K) <br />Thermoplastic <br />Tie bars <br />Tie bar baskets <br />Timber products (treated and <br />Certificate of compliance for timber and lumber must state the species of the <br />untreated) <br />material to be shipped and include a certified grading report. If treated, certified <br />treating report. <br />Threaded tie bar splice couplers <br />Traffic stripe <br />Paint or thermoplastic <br />Turf sod <br />Certificate of compliance required for: <br />Underdrains <br />Type of pipe <br />• Tubing <br />• Fitting <br />Waterproofing fabric <br />Waterstop <br />Certificate of compliance for waterstop material must state compliance with <br />ara graph 6 of Army Corps of Engineers CRD-C 572. <br />Welded wire fabric <br />Wire mesh fencing <br />Page 7 of 7 <br />January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.