My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:07 AM
Creation date
9/10/2025 8:39:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 MITIGATION MONITORING AND REPORTING PROGRAM <br />Regulatory Requirements/Mitigation Measures <br />Timing <br />Responsible <br />Monitoring <br />Signature/Date <br />Party <br />Party <br />of Compliance <br />California Building Code and City of Santa Ana <br />requirements applicable at the time of issuance of <br />grading or construction permits. The final design - <br />level geotechnical investigation shall include <br />recommendations related to site grading and <br />earthwork, fill materials, compaction, foundations, <br />dewatering, and other structural elements. The <br />report recommendations shall be included in <br />construction specifications and permits, approved <br />by the City's Building and Safety Division, and <br />confirmed through on -site inspections. <br />Project- <br />Implementation of Geotechnical <br />Prior to the <br />Project <br />City of Santa Ana <br />Specific <br />Recommendations <br />issuance of <br />Applicant/ <br />Planning <br />MM G-2 <br />Project plans, grading specifications, and <br />grading or <br />Construction <br />Division/City of <br />construction permitting shall incorporate site- <br />construction <br />Contractor <br />Santa Ana <br />specific earthwork and ground improvement <br />permits <br />Building Safety <br />requirements related to seismic ground shaking, <br />Division <br />liquefaction, settlement, collapse, subsidence, and <br />expansive soils consistent with the California <br />Building Code and City of Santa Ana requirements <br />applicable at the time of issuance of grading or <br />construction permits as stated in the final design - <br />level geotechnical investigation and approved by <br />the City's Building and Safety Division. This shall <br />include recommendations related to site grading <br />and earthwork, fill materials, compaction, <br />foundations, dewatering, and other structural <br />elements. <br />Project- <br />The project applicant shall retain a qualified <br />During ground- <br />Project <br />City of Santa Ana <br />Specific <br />professional paleontologist to monitor or supervise <br />disturbing <br />Applicant/ <br />Planning Division <br />MM G-3 <br />full-time monitoring should excavation occur into <br />activities <br />Construction <br />native Pleistocene -age soil and bedrock greater <br />Contractor <br />than 4 feet in depth. Ground disturbance refers to <br />activities that would impact subsurface geologic <br />deposits, such as grading, excavation, boring, etc. <br />Activities taking lace in current topsoil or within <br />City of Santa Ana <br />August 2025 <br />4-12 <br />The Village Santa Ana Specific Plan Project <br />Final Supplemental Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.