My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:07 AM
Creation date
9/10/2025 8:39:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 MITIGATION MONITORING AND REPORTING PROGRAM <br />Regulatory Requirements/Mitigation Measures <br />Timing <br />Responsible <br />Monitoring <br />Signature/Date <br />Party <br />Party <br />of Compliance <br />previously disturbed fill sediments, e.g., clearing, <br />grubbing, pavement rehabilitation, do not require <br />paleontological monitoring. Bedrock can occur at <br />varying depths depending on the portion of the <br />project area. <br />If no significant fossils have been recovered after <br />50 percent of excavation has been completed, full- <br />time monitoring may be modified to weekly spot- <br />check monitoring at the discretion of the qualified <br />professional paleontologist. If the qualified <br />professional paleontologist determines during the <br />course of excavations that project excavations are <br />located within fill or disturbed soils, or that the <br />sensitivity for significant paleontological resources <br />is otherwise low, then monitoring may be reduced <br />or suspended at the qualified professional <br />paleontologist's discretion. The determination to <br />reduce or discontinue paleontological monitoring in <br />the project area shall be based on the professional <br />opinion of the qualified professional paleontologist <br />regarding the potential for fossils to be present after <br />a reasonable extent of the geology and stratigraphy <br />has been evaluated. <br />GREENHOUSE <br />GAS EMISSIONS <br />RR GHG-1 <br />New buildings are required to achieve the current <br />Prior to <br />Project <br />City of Santa <br />California Building Energy Efficiency Standards <br />discretionary <br />Applicant <br />Ana Planning <br />(Title 24, Part 6) and California Green Building <br />approval <br />Division <br />Standards (CALGreen) Code (Title 24, Part 11). <br />The 2019 Building Energy Efficiency Standards <br />became effective January 1, 2020. The Building <br />and Energy Efficiency Standards and CALGreen <br />are updated tri-annually. <br />RR GHG-2 <br />Construction activities are required to adhere to <br />During <br />Project <br />City of Santa Ana <br />California Code of Regulations, Title 13, Section <br />construction <br />Applicant/ <br />Building <br />Construction <br />Safety Division <br />Contractor <br />City of Santa Ana <br />August 2025 <br />4-13 <br />The Village Santa Ana Specific Plan Project <br />Final Supplemental Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.