My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:07 AM
Creation date
9/10/2025 8:39:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 MITIGATION MONITORING AND REPORTING PROGRAM <br />Regulatory Requirements/Mitigation Measures <br />Timing <br />Responsible <br />Monitoring <br />Signature/Date <br />Party <br />Party <br />of Compliance <br />2449, which restricts the nonessential idling of <br />construction equipment to five minutes or less. <br />RR GHG-3 <br />New buildings are required to adhere to the <br />Prior to <br />Project <br />City of Santa <br />California Green Building Standards Code and <br />discretionary <br />Applicant <br />Ana Planning <br />Water Efficient Landscape Ordinance <br />approval <br />Division <br />requirements to increase water efficiency and <br />reduce urban per capita water demand. <br />RR GHG-7 <br />The California Green Building Standards Code <br />Prior to <br />Project <br />City of Santa <br />(CALGreen) requires the recycling and/or <br />discretionary <br />Applicant/ <br />Ana Planning <br />salvaging for reuse at minimum of 65 percent of the <br />approval <br />Construction <br />Division <br />nonhazardous construction and demolition waste <br />Contractor <br />generated during most "new construction" projects <br />(CALGreen Code §§ 4.408 and 5.408). <br />Construction contractors are required to submit a <br />construction waste management plan that <br />identifies the construction and demolition waste <br />materials to be diverted from disposal by recycling, <br />reuse on the project, or salvaged for future use or <br />sale and the amount (by weight or volume). <br />Project- <br />See above under Air Quality <br />-- <br />-- <br />-- <br />-- <br />Specific <br />MM AQ-1 <br />HAZARDS AND HAZARDOUS MATERIALS <br />RR HAZA <br />Hazardous materials and hazardous wastes will be <br />During <br />Project <br />City of Santa <br />transported to and/or from projects developed <br />construction <br />Applicant/ <br />Ana Planning <br />under the General Plan Update in compliance with <br />Construction <br />Division/City of <br />any applicable state and federal requirements, <br />Contractor <br />Santa Ana <br />including the U.S. Department of Transportation <br />Building Safety <br />regulations listed in the Code of Federal <br />Division <br />Regulations (Title 49, Hazardous Materials <br />Transportation Act); California Department of <br />Transportation standards; and the California <br />Occupational Safety and Health Administration <br />standards. <br />City of Santa Ana <br />August 2025 <br />4-14 <br />The Village Santa Ana Specific Plan Project <br />Final Supplemental Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.