My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:07 AM
Creation date
9/10/2025 8:39:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 2 <br />PROJECT SUMMARY <br />2.1 DESCRIPTION OF PROJECT PROPOSED FOR APPROVAL <br />The Village Santa Ana Specific Plan Project would provide for redevelopment of the <br />approximately 17.2-acre site located on the northeast corner of West Sunflower Avenue and Bear <br />Street, transected by South Plaza Drive. The project site comprises seven parcels (Assessor's <br />Parcel Numbers 412-451-01 through -04 and 412-131-10, -20, -21 ((Project Site)). The Project <br />Site is currently occupied by the South Coast Plaza Village commercial center on both sides of <br />South Plaza Drive which consists of approximately 164,049 square feet of retail shops and <br />restaurants, offices, and the Regency Theatres cinema building. The City's GPU Land Use <br />Element designates the project site as District Center -High (DC-5) within the South Bristol Street <br />Focus Area (SBSFA). Development in the DC-5 designation is intended to provide urban retail, <br />residential, mixed -use, and employment centers. The Project Site is currently zoned as Specific <br />Development Plan No. 48 (SD-48) which was adopted in 1989 and was last amended in 1997. <br />The Project would redevelop the site with mixed -use commercial and residential, residential only, <br />and commercial only buildings. A central commercial area would include a variety of commercial <br />uses, such as restaurants, a market, and retail uses, with additional commercial uses extending <br />through the ground floor of adjacent residential buildings. Stand-alone residential and mixed -use <br />buildings would provide housing opportunities for residents in the City's SBSFA. In total, The <br />Project would include up to 1,583 residential units (encompassing approximately 1,850,000 <br />square feet of building space), 80,000 square feet of retail space, 300,000 square feet of office <br />space, and approximately 7.5 acres of publicly accessible open space and common areas. The <br />Specific Plan includes a maximum height of 25 stories with a minimum of 1 story for <br />commercial/office only buildings and no minimum height for residential or mixed -use buildings. <br />Parking would be provided in tower and podium buildings and underground building levels with <br />up to four levels below grade. <br />At full buildout, the Project is anticipated to provide a combined 13.8 acres of public and private <br />outdoor and recreation space including approximately 7.5 acres of publicly accessible open space <br />and common areas and 6.3 acres of private outdoor and amenity spaces. Public open spaces at <br />the Project would consist of active spaces, outdoor seating, garden paseos, a fitness loop, and a <br />recreational lawn. Private open space amenities include outdoor balconies and patios, pools and <br />spas, outdoor kitchens, and communal gathering spaces. The proposed Project would also <br />include roadway and streetscape modifications and improvements along Sunflower Avenue, Bear <br />Street, and South Plaza Drive in addition to new access points throughout the project site and a <br />bicycle network which includes a new Class IV cycle track along Sunflower Avenue, and a new <br />Class I bike path along Bear Street. <br />Construction of the proposed Project is anticipated to begin January 2026 and could take up to <br />20 years to complete. Construction of the proposed Project would be implemented in a series of <br />five phases to reflect anticipated market conditions and to ensure that access, public facilities, <br />and infrastructure connections are appropriately installed to serve the Project. Demolition of the <br />entire Project Site would occur during the first phase of the construction period. Subsequently, <br />the construction period for each phase would generally include excavation, grading, trenching, <br />pile driving, installation of utilities, building construction, architectural coating, paving activities, <br />City of Santa Ana The Village Santa Ana Specific Plan Project <br />August 2025 CEQA Findings of Fact and Statement of Overriding Considerations <br />2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.