My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Agreement with the Municipal Water District of Orange County for Shared Programs
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 18 - Agreement with the Municipal Water District of Orange County for Shared Programs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:23 AM
Creation date
9/10/2025 9:35:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />July 23, 2025 <br />24 <br /> <br /> <br />pre-inspection. For commercial sites that are also participating in the Turf Replacement Program and <br />inspected by Metropolitan’s inspection contractor, Participant Agency is required to perform the pre- <br />inspection for the Spray-to-Drip portion of the project. <br /> <br />On-Site Pre-Inspection <br />In-person pre-inspections must include: <br />x Visual verification of existing spray irrigation <br />x Physical/manual measurement of proposed irrigation conversion area using the <br />Moasure device. <br />x Photos taken by inspector of project area (4 to 6), which must reflect the spray <br />irrigation at the time of inspection. Photos must be taken from appropriate <br />angles, with visible points of reference, and at a sufficient distance to allow for <br />review. <br /> <br />Measuring Sites Aerially <br />Measuring sites aerially must include: <br />x GIS or equivalent aerial measurement <br />x Please note that measuring sites aerially is allowed for pre-inspections only. <br />x Customer is to provide photos of the spray-to-drip conversion before starting the project <br /> (pre-project installation). <br />x The inspector should be capable of spotting abnormalities in pre-project photos submitted <br />by customers, and if found, should perform mandatory on-site inspections. <br />x If aerial review is not possible due to obstructions (tree coverage) or inconclusive, <br />Participant Agency should perform a physical pre-inspection as described above. <br />Photo-Based Pre-Inspection <br />MWDOC can perform a photo-based pre-inspection for Spray to Drip applicants who have already <br />received a pre-inspection for an accompanying Turf Replacement application, as long as the <br />requested square footage is the same. This occurs in a case-by-case scenario. <br /> <br />Once the pre-inspection is complete, the inspector will complete the Pre-inspection section in <br />Droplet, in full, and upload all photos and documentation. Once the Pre-inspection form has been <br />submitted, it will be reviewed by MWDOC. If the application has satisfied all of the above <br />requirements, a Letter to Proceed (LTP) is generated by MWDOC/Participant Agency and emailed <br />to the applicant. The funding is reserved at this point and cannot increase. However, the funding <br />amount may decrease if the applicant installs less drip equipment than was specified on the <br />application or if the costs of the equipment are less than the estimated rebate amount. Should <br />the application fail the pre-inspection process, the application will be denied. <br />Post-Inspection Procedure <br />Once the Spray-to-Drip Project is complete, applicant completes the Spray-to-Drip application to <br />request a mandatory on-site post-inspection. Prior to scheduling the post-inspection, the <br />application will be reviewed by MWDOC to confirm the following: <br />"!# <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.