My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VFS FIRE & SECURITY (BERNEL INC.)
Clerk
>
Contracts / Agreements
>
V
>
VFS FIRE & SECURITY (BERNEL INC.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 3:08:40 PM
Creation date
9/10/2025 3:08:00 PM
Metadata
Fields
Template:
Contracts
Company Name
VFS FIRE & SECURITY (BERNEL INC.)
Contract #
A-2025-140-02
Agency
Public Works
Council Approval Date
8/19/2025
Expiration Date
8/31/2028
Insurance Exp Date
5/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) SCOPE OF WORK <br /> 7. Pre-Action Valve <br /> • The prime water level in pre-action systems shall be tested for compliance <br /> with the manufacturer's recommendations <br /> • Low air pressure alarms shall be tested for compliance with the <br /> manufacturer's recommendations <br /> • Valves shall be trip tested in accordance with the manufacturer's <br /> recommendations <br /> 8. Pre-Action/Deluge Valves <br /> • During the annual trip test, the interior of the valves shall be cleaned <br /> thoroughly and parts repaired or replaced as necessary <br /> 9. Hose Connections <br /> • Flush all roof outlets <br /> 10. Hose and Nozzles <br /> • Inspect that fire hose is not damaged or mildewed <br /> • Inspect for current hydrostatic test dates or installation dates <br /> • Verify fire hose station is free from exterior obstructions (maintain 36" access) <br /> • Verify rack or reel rotates freely <br /> • Verify fire hose is properly racked <br /> • Verify fire hose nozzle is the correct type, functional, and not missing <br /> • Inspect nozzle gaskets are not missing or deteriorated <br /> Fire Mains <br /> 1. Hydrants <br /> • Fully open and flow water until all foreign material has cleared <br /> • Maintain flow for at least one minute <br /> • Record flow rate by use of a Pitot tube flow measurement <br /> • Exercise hydrant valves for proper operation <br /> 2. Backflow Preventer Assemblies <br /> • Inspect DCA & DCDA to ensure the OS&Y valves are in the open position <br /> • Verify valves are locked/supervised <br /> Fire Pumps <br /> 1. Control Valve — Position and Operation <br /> • All valves shall be operated through their full range of motion <br /> • Lubricate all OS&Y valve stems <br /> 2. Pump Operation <br /> • Test Pump System: Check pump shaft end play <br /> • Test Pump System: Check accuracy of pressure gauges and sensors <br /> • Test Pump System: Check pump coupling alignment <br /> City of Santa Ana IFB No. 25-047 Page 18 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.