My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FOUNTAIN VALLEY, CITY OF (7)
Clerk
>
Contracts / Agreements
>
F
>
FOUNTAIN VALLEY, CITY OF (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 9:45:34 AM
Creation date
9/16/2025 9:45:27 AM
Metadata
Fields
Template:
Contracts
Company Name
FOUNTAIN VALLEY, CITY OF
Contract #
A-1969-002
Agency
Public Works
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. To bear the City of Santa Ana's share of the expense of <br /> preparation of plans and specifications and construction engineering costs , <br /> such share to be 61.67% of the Total preliminary and construction engineer- <br /> ing costs. <br /> c. To bear the City of Santa Ana's share of the construction <br /> costs required to complete the traffic control signal system and highway <br /> lighting referred to herein, such share to be 61.67% of the total construction <br /> costs. <br /> d. To acquire and pay for all costs involved in securing all <br /> rights of way and to pay for all costs for all road work within the City of <br /> Santa Ana necessary for the construction of the traffic control signal system <br /> and highway lighting. <br /> e. City of Santa Ana shall maintain and operation the entire <br /> traffic control signal system and highway lighting as constructed. <br /> f. City of Santa Ana will relocate traffic signal equipment <br /> as required in the future by further development of adjacent properties <br /> either within the City Limits of Santa Ana or Fountain Valley. <br /> SECTION II <br /> For and in consideration of the covenents and conditions to be <br /> kept and performed by the City of Santa Ana as set forth in this Agreement, <br /> the City of Fountain Valley agrees: <br /> a. To reimburse City of Santa Ana promptly upon rendition of <br /> statement therefor, City of Fountain Valley's share of expense of preparation <br /> of plans and specifications, construction engineering costs and construction <br /> costs required to complete the traffic control signal system and highway light- <br /> ing, such share to be 38.33% of the total preliminary and construction engineer- <br /> ing costs and construction costs. <br /> b. To reimburse the City of Santa Ana promptly upon rendition <br /> of statement therefore, City of Fountain Valley's share 38.33% of the Total <br /> subject intersection's traffic signal system and intersection lighting main- <br /> tenance and operational expenses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.