Laserfiche WebLink
Findings: The City finds that the Project would result in no impact to wildfire related to requiring <br /> the installation or maintenance of associated infrastructure that may exacerbate fire risk or that <br /> may result in temporary or ongoing impacts to the environment. (Draft Supplemental EIR, p. 5-14.) <br /> Explanation of the Rationale:As previously discussed,the Project site is located within the City, <br /> which is not located in or near a state responsibility area or lands classified as a VHFHSZ. <br /> Therefore, the Project would not require the installation or maintenance of associated <br /> infrastructure that may exacerbate fire risk or that may result in temporary or ongoing impacts to <br /> the environment, and no impact to wildfire would occur. (Draft Supplemental EIR, p. 5-14.) <br /> Threshold W-4: The Project would not expose people or structures to significant risks, <br /> including downslope or downstream flooding or landslides, as a result of <br /> runoff, post-fire slope instability, or drainage changes. <br /> Findings: The City finds that the Project would result in no impact to wildfire related to exposing <br /> people or structures to significant risks due to runoff, post fire slope instability or drainage <br /> changes. (Draft Supplemental EIR, p. 5-14.) <br /> Explanation of the Rationale:As previously discussed,the Project site is located within the City, <br /> which is not located in or near a state responsibility area or lands classified as a VHFHSZ. <br /> Therefore, the Project would not expose people or structures to significant risks, including <br /> downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, <br /> or drainage changes. No impact to wildfire would occur. (Draft Supplemental EIR, p. 5-14.) <br /> Cumulative Impacts: The Project would not result in cumulative impacts concerning wildfire. <br /> Findings: The City finds that the Project would result in no cumulative impacts concerning <br /> wildfire. (Draft Supplemental EIR, pp. 5-13—5-14.) <br /> Explanation of the Rationale: The Project site is located within the City, which is not located in <br /> or near a state responsibility area or lands classified as a VHFHSZ. Therefore, no cumulative <br /> impacts to wildfire would occur. (Draft Supplemental EIR, pp. 5-13--5-14.) <br /> Resolution No.2026-041 <br /> Page 66 of 140 <br />