My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-042 - The Village Santa Ana Specifc Plan at Sunflower Avenue
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2025
>
2025-042 - The Village Santa Ana Specifc Plan at Sunflower Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 10:34:44 AM
Creation date
9/25/2025 10:34:23 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Conditions for Approval for Vesting Tentative Tract Map No. 2025-06 <br /> Vesting Tentative Tract Map (VTTM) No. 2025-06 is approved subject to compliance, to <br /> the reasonable satisfaction of the Planning Manager, with all applicable sections of the <br /> Santa Ana Municipal Code, the California Administrative Code, the California Building <br /> Standards Code, and all other applicable regulations. The Applicant shall comply with <br /> each and every condition listed in order to exercise the rights conferred by this vesting <br /> tentative tract map. The Applicant shall remain in compliance with all conditions listed <br /> below throughout the life of the Project. Failure to comply with each and every condition <br /> may result in the revocation of the vesting tentative tract map. <br /> VTTM No. 2025-06 has been processed concurrently with the Village Santa Ana Specific <br /> Plan (SP-6). The VTTM will create the basis for the legal lots for each development Parcel <br /> and rights-of-way dedications. In accordance with the subdivision map, the Owner shall <br /> be subject to the following standards and conditions: <br /> 1. Applicant shall record all legal documents for street dedications along Sunflower <br /> Avenue, Bear Street, and Plaza Drive, and all other interior streets/drive aisles that <br /> intersect with public streets in a form agreeable to the City of Santa Ana. <br /> 2. Applicant shall comply with all applicable recommendations as identified by the <br /> Traffic Circulation Analysis (TCA) dated March 26, 2025, and attached hereto as <br /> reference as Exhibit C. <br /> 3. Applicant shall comply with the applicable recommendations as identified by the <br /> Parking Management Plan (PMP) prepared March 26, 2025, and attached hereto <br /> as reference as Exhibit D. <br /> 4. Applicant shall complete an approved preliminary Water Quality Management Plan <br /> (WQMP) approved by the Public Works Agency. <br /> 5. Applicant shall obtain an approval from Republic Services and the City on trash <br /> circulation and collection. <br /> 6. Applicant shall construct public improvements as specified on the Vesting <br /> Tentative Tract Map, including, but not limited to, street widenings, sidewalks, <br /> landscaping, irrigation, bus stop pads and shelters, asphalt pavement, raised <br /> medians, traffic signals and stops, crosswalks, street lights, bicycle facilities, and <br /> pedestrian facilities, as determined by the Executive Director of the Public Works <br /> Agency. <br /> 7. Applicant shall construct, at their sole expense, new public water mains, sized in <br /> accordance with the hydraulic study recommendations and as approved by the <br /> Water Resources Manager. <br /> Resolution No. 2025-042 <br /> Page 7 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.