Laserfiche WebLink
=a 'i <br /> CITY OF SANTA ANA <br /> D. Consultant shall prepare a memorandum comparing the results of the 'Before' and 'After' <br /> field study with reference to the specific MOE's. The report shall specifically give data on <br /> total project cost for the PI along with a one-year and three-year projection on benefit to <br /> cost. Consultant shall present the findings to the Board. <br /> E. Consultant shall finalize the memorandum based on comments from City of Santa Ana <br /> and involved agencies. GHG calculations shall be performed and incorporated into the <br /> memorandum and Final Report. <br /> City of Santa Ana may request a presentation on the comparison of the 'Before' and 'After' <br /> conditions along the PROJECT. Any requested presentation shall include visuals and short <br /> summaries of overall project achievements that can be quickly understood by staff of all levels. <br /> Deliverables - Task 2: <br /> 1. Report summarizing data collection and field review efforts, including intersection turning <br /> counts, traffic collision analysis, current traffic signal timing patterns, drawings and photos <br /> of intersection features, and recommended mitigations to perceived problems. <br /> 2. Deliverable of drawings, photos, and counts to Agencies shall be limited to political <br /> boundaries. <br /> 3. Draft and Final Memorandum documenting the results of the 'Before' study is to be <br /> distributed to City of Santa Ana and Partner Agencies as a discussion item. <br /> 4. Draft and Final Memorandum comparing the results of the 'Before' and 'After' studies, <br /> including benefit-to-cost ratio, to be distributed to City Santa Ana and Partner Agencies as <br /> a discussion item. <br /> 5. Electronic versions of all data files and memorandum to City Santa Ana and Partner <br /> Agencies. <br /> 6. Presentation to the City Santa Ana and Partner Agencies of the 'Before' and 'After' study <br /> comparison. <br /> III. Task 3: System Design and Construction <br /> If deemed necessary by City of Santa Ana or through request of a Partner Agencies, consultant <br /> shall prepare any design construction documents in the form of sketches to full-fledged Plans, <br /> Specifications, and Estimates (PS&E). Consultant shall prepare such plans for use in the <br /> construction of the project per each respective agency standards. Consultant shall supply such <br /> documentation to City of Santa Ana and the agency owning the affected facility for approval prior <br /> to commencing any construction. <br /> Sub-Task 3.1: Design Plans and Standards <br /> Consultant will be required to design, procure, install, construct, and implement all desired <br /> components of the project as described in List of Improvement (Scope of Work- Attachment B). <br /> At a minimum, consultant shall generate design plans as follows to ensure appropriate <br /> construction documents are developed to capture all improvements desired by the Agencies. <br /> 10 <br />