My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCADIS U.S., INC. (3)
Clerk
>
Contracts / Agreements
>
A
>
ARCADIS U.S., INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 2:53:05 PM
Creation date
10/3/2025 2:51:07 PM
Metadata
Fields
Template:
Contracts
Company Name
ARCADIS U.S., INC.
Contract #
A-2025-152
Agency
Public Works
Council Approval Date
9/16/2025
Expiration Date
9/15/2028
Insurance Exp Date
6/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> d. Contractor correspondence <br /> e. Contract change order requests, calculations, estimates and <br /> documentation <br /> f. Compilation of all relevant inspection reports and photos <br /> g. Tracking of quantities of work completed and progress payments records <br /> and calculations <br /> h. Guarantees, certifications, affidavits, leases, easement deeds, operating <br /> & maintenance manuals, warranties and other documents as stipulated in <br /> contract documents <br /> i. Electronic versions of all files, organized and compiled in a logical <br /> manner. <br /> 16. Final As-Built record drawings in both hard copy and electronic format; provided to each <br /> Partner Agency. <br /> IV. Task 4: Signal Timing Optimization and Implementation <br /> The project aims to improve efficient traffic operations along the regional corridor for all modes <br /> of transportation. As part of this task, consultant will evaluate existing timing conditions, generate, <br /> implement and fine-tune recommended optimized signal timing plans based on available data <br /> and improvements planned in the project. Guidelines and standards for signal synchronization <br /> continue to evolve with the innovations in technology. City of Santa Ana encourages consultant <br /> to present progressive and forward-thinking optimization solutions for more efficient operations <br /> on this project. <br /> As stated in Task 2, this corridor is part of OCTA's Countywide Baseline Project and is currently <br /> collecting data, developing traffic signal synchronization timing, and will implement and fine tune <br /> new timing for all the fifty-seven (57) agency signals along this corridor, except the Caltrans <br /> signals. Therefore, Signal Timing Optimization and Implementation for this project will be limited <br /> to the four (4) Caltrans intersections. The Consultant shall closely coordinate Signal Timing <br /> Optimization and Implementation with OCTA's Countywide Baseline Project. Consultant shall <br /> coordinate with Caltrans, City of Santa Ana and Partner Agencies to execute a Cooperative <br /> Agreement with Caltrans for this Task. <br /> Sub-Task 4.1: Base Network <br /> A. Consultant shall work with the City of Santa Ana, Caltrans and Partner Agencies to <br /> develop a model of the four (4) Caltrans intersections and study area and calibrate the <br /> model based on field observations of existing conditions. <br /> B. Signal synchronization of existing and optimized networks shall be conducted in latest <br /> Synchro software. The consultant must be cognizant of the version of Synchro that the <br /> receiving Agency is using and provide any files in that version. <br /> C. The corridor model must be consistent with all aspects and seamlessly interface with <br /> the Countywide Baseline Project. The project shall be developed with latest Synchro and <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.